| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.7 LAccepted-AOC H NO 08 LATIF GARDEN ASSANDH ROAD PANIPAT | PANIPAT | HARYANA | 132101 | ₹2.7 L Quoted ₹3.0 L | L-1 | Accepted-AOC Lowest |
| 2 | L-2₹3.1 L+₹5,539.53 (1.83%)Rejected-AOC | ₹3.1 L+₹5,539.53 (1.83%) | L-2 | Rejected-AOC Highest |
Tender Value
Refer Docs
EMD Value
₹2,500
Closing Date
15 May 2021, 5:00 pmClosed
Executive Engineer
Executive Engineer Provincial Division PWD B N R Panipat
Construction of 5 span slab Culvert at RD 1.300 of Putthar App. Road in Panipat Distt.
2021_HRY_171099_1
PWD_PNP_156
Open Tender
Civil Works
Works
60 days
Panipat
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹2,500
14 Jul 2021
7 May 2021
17 May 2021
7 May 2021
15 May 2021
7 May 2021
Amount
Earth work in excavation in foundations, trenches, etc.in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres (HSR 6.6)
Cement Concrete 1:4:8 with brick ballast 40mm nominal size in foundation and plinth.(HSR 10.36)
First class brick laid in cement sand mortar 1:5 in foundation and plinth.(HSR 11.3)
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work in slabs with inclination not exceeding 25 degree with horizontal, excluding steel reinforcement, but including centring and shuttering,laid in position complete in all respects. (HSR 10.82+10.95(a)
FE- 500 EQR TMT Steel Bars for R.C.C. works where not included in the complete rate of R.C.C. including bending binding & placing in position complete TATA, TISCON will be praferred. In case of non availability RINL, SAIL will be used (18.22)
Cement Concrete 1:2:4 with stone aggregate 20mm nominal size in first storey upto 4 meters above plinth level. (HSR 10.59)
Brick-on-edge flooring laid in cement sand mortar 1:4 on 75 mm thick cement 1:8:16 and 100 mm sand filling and cement pointed 1:2 on top. (HSR 14.23)
Cement pointing 1:2 deep variety on brick and tile work.(HSR 15.60) Note:- In case of any discrepancy found in nomenclature/ unit of item of BOQ depicted in the DNIT. The nomenclature/unit of MORTH (5th) revision / HSR shall be applicable.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .