Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-Finance | L1 | Accepted-Finance QUOTED LOWEST | |
| 2 | L2₹25.8 L+₹25,541.78 (1.00%)Rejected-Finance MIRIK BUSTY DUPTIN DIST DARJEELING PIN 734214 | MIRIK | DARJEELING | WEST BENGAL | 734214 | L2 | Rejected-Finance QUOTED 2ND LOWEST | |
| 3 | L3₹26.1 L+₹51,083.56 (2.00%)Rejected-Finance | L3 | Rejected-Finance QUOTED 3RD LOWEST | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹25.5 L
EMD Value
₹51,084
Closing Date
5 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER, MIRIK ENGINEERING DIVISION KRISHNA NAGAR, MIRIK-734214
Recovery and reconstruction of road from Nim Lepchas house to Mira Rai s house at Thulung Gaon ( L 2.00 km)
2026_GTA_5073831_5
NieT03/EE/MED/GTA/2026-27
Open Tender
CIVIL WORKS
Percentage
180 days
Mirik
As per Niet
5 documents required · 5 mandatory
₹0
₹51,084
Yes
5 Nov 2026
21 Sept 2026
8 Oct 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Land Slide Clearance in Soil Clearance of land slides in soil and ordinary rock by abull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side. | 180.96 | m3 | 61.8 | ₹11,183.33 |
| 2 | Earthwork in excavation of foundation trenches in all sorts of soil ( including mixed soil but excluding stoney and moorum soil ) including removing, spreading or stacking the spoils within a lead of 150metres as directed and including trimming the sides of the trench levelling, dressing & ramming the bottom, bailing or pumping out water et. As required complete, depth of excavation exceeding 1 metre upto 2m below avrage bed lable at the site of excavation and requring shoring. | 132.02 | m3 | 114 | ₹15,050.28 |
| 3 | Plum concrete work with cement concrete (1:3:6) with 40% 30mm down graded stone metal 60% and stone boulder of size 150mm and above placed in position as directed excluding shuttering if any. | 245.4 | m3 | 3,304 | ₹8,10,801.6 |
| 4 | Providing formwork and staging including Hire & Labour charges for Abutment and its components and retaing wall and its components for Height Upto 3 metre clear span including stripping off and removing after completion of work as per specification and direction.a) where shoring not required | 176.61 | m2 | 214 | ₹37,794.54 |
| 5 | Rubble masonry in cement (6:1) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site. | 221.05 | m2 | 3,739 | ₹8,26,505.95 |
| 6 | Dry rubble masonry with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site. | 94.73 | m3 | 2,450 | ₹2,32,088.5 |
| 7 | Earth in filling in foundation trenches and at the back of abutments with good earth (sandy soil) in layers not exceeding 15 cm. including watering and ramming layer by layer complete with earth obtained by fresh excavation from land arranged by Department beyond 150 m. but within 300 m. including all lifts. Earth to be approved by the Engineer-in-charge. | 126.2 | m3 | 161 | ₹20,318.2 |
| 8 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. | 84.14 | m3 | 2,250.82 | ₹1,89,383.97 |
| 9 | ADD 18% GST | 21,43,126.36 | No | 0.18 | ₹3,85,762.74 |
| 10 | ADD 1% CESS | - | No | 0.01 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
Tendernotice_2.pdf
PDF • 1.32 MB
BOQ_5158789.xls
BOQ • 0.33 MB
GTAFORM.pdf
Tender Documents • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .