| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.0 LAccepted-Finance 19 A DURGA BARI SADAR BAZAR MEERUT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | L1 | Accepted-Finance OK | |
| 2 | L2₹34.9 L+₹2.9 L (9.18%)Accepted-Finance | L2 | Accepted-Finance OK | |
| 3 | L3₹36.1 L+₹4.1 L (12.8%)Accepted-Finance | L3 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | Technocrat Electrical L1 | SATKAR TRADERS L2 | M/s S.S. Refregeration L3 |
|---|---|---|---|---|---|---|
| 1.00 | Work
Dismantling of 63 MVA 132/33 KV T/F against Increasing capacity
Complete dismantling of 132/33 kV, 63 MVA power transformer along with all associated accessories at 220 kV S/S Sector-20, including removal of radiators, conservator tank, oil pipelines, bushings, etc. The transformer oil shall be drained into drums / oil tankers (20 KL / 50 KL) as required. All dismantled materials shall be safely shifted and stacked at a designated location near the store, strictly as per the instructions of JE/SDO. The scope includes all incidental works, tools, plants, and manpower necessary to complete the work in a safe and satisfactory manner. | 2 | Job | 9,990 ₹19,980 Lowest | 11,000 ₹22,000 | 15,000 ₹30,000 |
| 2.00 | Shifting/dragging of main tank of 132/33 kV, 63 MVA power transformer from plinth to a nearby location within the premises of 220 kV Sub-Station, Sector-20, Noida, up to a maximum distance of 20 metres, strictly as per the directions of JE/SDO, including all tools, plants, manpower, and incidental works required for safe execution. | 2 | Job | 14,890 ₹29,780 Lowest | 15,500 ₹31,000 | 15,700 ₹31,400 |
| 3.00 | Additional Shifting 50M@ 5M per job | 10 | Job | 50 ₹500 | 46 ₹460 Lowest | 100 ₹1,000 |
| 4.00 | Packing of HV, LV and Neutral bushings in empty wooden crates, including all handling and safety precautions. | 2 | Job | 4,900 ₹9,800 Lowest | 5,250 ₹10,500 | 6,000 ₹12,000 |
| 5.00 | Dismantling of the emulsifier system installed on 63 MVA T/F-I, by cutting with gas cutter, including labour for shifting and proper stacking of dismantled materials at store/designated safe location, complete in all respects. | 1 | Job | 2,900 ₹2,900 Lowest | 3,150 ₹3,150 | 3,300 ₹3,300 |
| 6.00 | Dismantling and shifting of existing 63 MVA transformer RTCC panel from control room, including disconnection of control cables, proper identification and tagging of cables for future reconnection, and shifting of RTCC panel to designated storage location, as per the instructions of the supervising engineer (SDO/JE), complete in all respects. | 2 | Job | 4,000 ₹8,000 | 3,679 ₹7,358 Lowest | 3,800 ₹7,600 |
| 7.00 | Dismantling of existing 120 kV lightning arrester along with its associated structure installed in 63 MVA, 132/33 kV Transformer Bays, including cutting of earthing connections and opening of jumpers, complete (1 job per LA with structure). | 6 | Job | 2,700 ₹16,200 | 2,678 ₹16,068 Lowest | 3,000 ₹18,000 |
| 8.00Erection of 100 MVA 132/33 KV T/F against increasing capacity Shifting / dragging of main tank of new 100 MVA, 132/33 kV power transformer from road to transformer plinth level within 220 kV Sub-Station, Sector-20, Noida, strictly as per the directions of JE/SDO, including all tools, plants, manpower, and incidental works required for safe execution. | ||||||
| 8.10 | Up to 20 Mtr distance | 2 | Job | 20,000 ₹40,000 Lowest | 20,100 ₹40,200 | 21,000 ₹42,000 |
| 8.20 | Additional shifting of 100 mtrs. (each 5 Meter per job) | 40 | Job | 50 ₹2,000 Lowest | 59 ₹2,360 | 100 ₹4,000 |
Tender Value
₹32.0 L
EMD Value
₹38,000
Closing Date
4 Aug 2026, 5:00 pmClosed
SE ETC NOIDA
220 KV SUBSTATION SECTOR-20 NOIDA
Increasing Capacity at 220 kV Substation Sector 20 Noida
2026_UPTCL_1168887_1
E-T-10/ETCN/2026-27
Open Tender
Electrical Works
Item Rate
60 days
NOIDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ETD NOIDA
₹38,000
29 Aug 2026
13 Jul 2026
5 Aug 2026
13 Jul 2026
4 Aug 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work
Dismantling of 63 MVA 132/33 KV T/F against Increasing capacity
Complete dismantling of 132/33 kV, 63 MVA power transformer along with all associated accessories at 220 kV S/S Sector-20, including removal of radiators, conservator tank, oil pipelines, bushings, etc. The transformer oil shall be drained into drums / oil tankers (20 KL / 50 KL) as required. All dismantled materials shall be safely shifted and stacked at a designated location near the store, strictly as per the instructions of JE/SDO. The scope includes all incidental works, tools, plants, and manpower necessary to complete the work in a safe and satisfactory manner. | 2 | Job | - | - |
| 2 | Shifting/dragging of main tank of 132/33 kV, 63 MVA power transformer from plinth to a nearby location within the premises of 220 kV Sub-Station, Sector-20, Noida, up to a maximum distance of 20 metres, strictly as per the directions of JE/SDO, including all tools, plants, manpower, and incidental works required for safe execution. | 2 | Job | - | - |
| 3 | Additional Shifting 50M@ 5M per job | 10 | Job | - | - |
| 4 | Packing of HV, LV and Neutral bushings in empty wooden crates, including all handling and safety precautions. | 2 | Job | - | - |
| 5 | Dismantling of the emulsifier system installed on 63 MVA T/F-I, by cutting with gas cutter, including labour for shifting and proper stacking of dismantled materials at store/designated safe location, complete in all respects. | 1 | Job | - | - |
| 6 | Dismantling and shifting of existing 63 MVA transformer RTCC panel from control room, including disconnection of control cables, proper identification and tagging of cables for future reconnection, and shifting of RTCC panel to designated storage location, as per the instructions of the supervising engineer (SDO/JE), complete in all respects. | 2 | Job | - | - |
| 7 | Dismantling of existing 120 kV lightning arrester along with its associated structure installed in 63 MVA, 132/33 kV Transformer Bays, including cutting of earthing connections and opening of jumpers, complete (1 job per LA with structure). | 6 | Job | - | - |
| 8Erection of 100 MVA 132/33 KV T/F against increasing capacity Shifting / dragging of main tank of new 100 MVA, 132/33 kV power transformer from road to transformer plinth level within 220 kV Sub-Station, Sector-20, Noida, strictly as per the directions of JE/SDO, including all tools, plants, manpower, and incidental works required for safe execution. | |||||
| 8.1 | Up to 20 Mtr distance | 2 | Job | - | - |
| 8.2 | Additional shifting of 100 mtrs. (each 5 Meter per job) | 40 | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
DOCTS-10.pdf
Tender Documents • 12.79 MB
BOQ_2193397.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .