Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 LAccepted-AOC | ₹25.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.8 LRejected-Finance | ₹25.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Elayaraja L1 | Moorthy A L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart First depth of 2m | 244.42 | M3 | 263 ₹64,282.46 | 263.78 ₹64,473.11 |
| 2.00 | Second Depth. OF 2m from 2m to 4m below GL For column footing | 21.29 | M3 | 275 ₹5,854.75 | 275.39 ₹5,863.05 |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc | 6.08 | M3 | 2,238 ₹13,607.04 | 2,238.79 ₹13,611.84 |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers. | 9.13 | M3 | 6,029 ₹55,044.77 | 6,029.45 ₹55,048.88 |
| 5.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department For footing below G.L. ( 1,50 to 4,50 below GL ) | 34.66 | M3 | 9,545 ₹3.3 L | 9,545.94 ₹3.3 L |
| 6.00 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | 2.53 | M3 | 9,545 ₹24,148.85 | 9,545.94 ₹24,151.23 |
| 7.00 | For column and brace I 0 to 4.5m from GL | 3.79 | M3 | 9,687 ₹36,713.73 | 9,687.01 ₹36,713.77 |
| 8.00 | For column and brace II 4.5m to 7.32m from GL | 2.97 | M3 | 10,520 ₹31,244.40 | 10,520.68 ₹31,246.42 |
| 9.00 | For column and brace III 7.32 to 10.98m from GL | 3.38 | M3 | 10,798 ₹36,497.24 | 10,798.57 ₹36,499.17 |
| 10.00 | For column and brace IV 10.98 to 14.64m from GL | 15.59 | M3 | 10,798 ₹1.7 L | 10,798.57 ₹1.7 L |
Tender Value
₹30.8 L
EMD Value
₹30,750
Closing Date
5 Mar 2026, 3:00 pmClosed
Block Development Officer(BP)
Panchyat Union Office , Vridhachalam
Construction of New Over Head Tank (60000 litre Capacity) at Erumanur Panchayatat Vridhachalam Block in Cuddalore District
2026_RDTN_670879_1
A6/0025/2026 General Fund 2025-26 Vridhachlam Block
Open Tender
Civil Works - Water Works
180 days
Panchyat Union Office, Vridhachalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹30,750
Yes
5 Mar 2026
5 Mar 2026
5 Mar 2026
5 Mar 2026
5 Mar 2026
5 Mar 2026
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart First depth of 2m
Second Depth. OF 2m from 2m to 4m below GL For column footing
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.5m from GL
For column and brace II 4.5m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column and brace IV 10.98 to 14.64m from GL
For column and brace V 14.64 to 18.3m from GL
Supplying Fabricating and Placing in Possition of HSD Steel rods for Reinforcement including cost of Steel and binding wire etc.
Supplying and Erecting Steel Centering for sides and soffits including necessary supports and shuttering to the required height for R.C.C. ITEM Using M.S.Sheets including labour charges etc. Below Ground Level. 0 to 3.30 m
For Brace I 0.0. to 3.30 m
For Brace II 3.3. to 4.30 m
For Brace II 5.3. to 6.30 m
For Brace III 8.3. to 9.30 m
For Brace III 11.30. to 12.30 m
Curved surface 0 to 3.30m
03.30 to 04.30m For
SQUARE COLUMN For column GL 0 to 3.30M
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.31m to 11.45m )
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Deparment officers
Fabrication, supply,delivery and fixing of out side MS Ladder of 45cm wide made out of 50x50x6 mmMS angle for sides and steps in 16mm MS Plain rod fixed at 30cm centre tocentre welded, jointedetc,Providing with suitable side supports, clamps, and locking arrangements provided with one coat of red oxide paint etc.
Providing and fixing of R.C.C. inner access ladder in R.C.C. 1:1.5:3 mix using 20mm ISS Metal including cost of reinforcement ,placing in grill in possition ,centering,shuttering charges mixing concrete curing etc.
Providing Ac vent cowl arrangements mosquito proof nylon net with 110mm dia Cowl etc.
Providing Cut Stone Slab in cm 1:3 mix
Providing man hole cover of size 0.60x0.60 in R.C.C. 1:1.5:3 mix with suitable reinforcement, 50x50x6mm MS Angle fixed along edges etc.
Provision for pipe connection arrangements for inlet, outlet, scour and overflow etc., including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc. complete as detailed below. 65mm dia GI pipes for inlet connection.
65mm dia GI elbow
65mm dia GI Flange set
65mm dia GI coupling
80mm dia GI pipes
90mm dia PVC Threaded coupler
80mm dia GI Tee
80mm dia GI elbow
80mm dia GM Gate valve
80mm dia GI Flange set
80mm dia GI coupling
80mm dia GI Dummy
Labour charges for GI pipe connection to the OHT , for inlet,outlet,overflow and scour arrangements including cutting and threading earth work excavation and refilling
Providing hand rails over the roof slab by using 32mm GI pipe with 40mm x 6mm MS flat and fixed with 12mm dia fastner bolt 75mm long and as directed by TWAD officers
As per item l(a) + l(b) Less item 2,3 & 4A & 4B Total
Earthwork excavation and depositing on bank with an intial lesd & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed soil as per SS 20 B for foundation
Sand filling with good river sand including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:2:4 mix using 20 mm metal used for Wearing Coat including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Brick Work in Cement Mortar 1:5 using Country Bricks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Plastering with cement mortar 1:3mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Filling the stones in soakpit incluiding the cost and conveyance of materials 40mm
Filling the stones in soakpit incluiding the cost and conveyance of materials 20mm
Rcc Precast rings
Ring and RCC Cover Slab
Earth Excavation and depositing on bank for with an initial lead and lift in all type soil for pipe line for 75mm (6KSC)dia pipe
Supply of unlasticised 75mm OD PVC/6ksc rigid Pipes as per BIS 4985/2000 with ISI Marking to site of works 75mm PVC /6sc Pipe
75mm PVC specials a)75mm Elbow
Lowering and Laying of the 75mm dia PVC pipes and secials to trench ,laying to proper grade and alignment,jointing with PVC coupler and specials fixing with solvent cement paste etc., complete
Re-filling with excavated soil complying with standard specification in layers of 15cm thick well rammed and consolidated after ipes and specials are laid and tested
Provision for Name board
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Erumanur.pdf
Tender Documents • 0.58 MB
BOQ_806234.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid