| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.2 L+₹76,450 (6.70%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAYAN AND COMPANY | K.THANGAMANI CONTRACTOR |
|---|---|---|---|---|---|
| 1.00 | Charges for welding of eroded and worn out portion of duct joints, and welded joints by welding with ms welding electrodes. | 150 | Mtr | 75,000 ₹88,500 | 67,500 ₹79,650 Lowest |
| 2.00 | b)DISMANTLING OF INSULATION ESTIMATE FOR 10 SQ .MTR | 150 | Mtr² | 56,250 ₹66,375 | 52,500 ₹61,950 Lowest |
| 3.00 | C)REINSULATION 10 M | 150 | Mtr² | 90,000 ₹1,06,200 | 82,500 ₹97,350 Lowest |
| 4.00 | Insulation work for the area where the work area is above 5 mtr from the ground or from the approach platform.( 1 No = 10 mtr2 ) | 10 | Nos | 27,000 ₹31,860 | 25,000 ₹29,500 Lowest |
| 5.00 | Charges for overhauling of gravimetric feeder after dismantling all the Idle rollers pulleys, bearings, checking of clean out conveyors and changing of bearings in the clean out conveyor shaft, chain link and changing of Belt and other wornout parts and reassembling the same in complete shape and oil filling in the gear box. This includes transportation of materials from and to stores and consumables. | 6 | Opn | 2,13,000 ₹2,51,340 | 2,04,000 ₹2,40,720 Lowest |
| 6.00 | Charges for draining the feeder gear box oil, removing the feeder gear box from position, dismantling the gear box, cleaning the gear box, inspection of bearings, gears, assembling the gear box, oil refilling and fixing in position as per the direction of Engineer in-charge, including cost of consumables. | 3 | Opn | 48,000 ₹56,640 | 45,000 ₹53,100 Lowest |
| 7.00 | Charges for dismantling the cold air gate, gear box, chain links and gates cleaning the above, applying grease changing the worn out parts and complete O/H of gear box and assembling the above parts and confirming free movement of gates etc. | 6 | Nos | 39,000 ₹46,020 | 36,000 ₹42,480 Lowest |
| 8.00 | Charges for cutting & removing the old eroded gate seal frame, arranging the new gate seals in orderly and seal welding to form leaf edge seal assembly in the HAG. (Top seal outer 2 Nos. per gate). | 6 | Sets | 30,000 ₹35,400 | 27,000 ₹31,860 Lowest |
| 9.00 | Charges for Renewal of Top seals inner (2 Nos. per gate). | 6 | Sets | 41,400 ₹48,852 | 36,000 ₹42,480 Lowest |
| 10.00 | Charges for Renewal of Bottom seals inner (2 Nos. per gate). | 6 | Sets | 39,000 ₹46,020 | 36,000 ₹42,480 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,100
Closing Date
2 Jun 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPM II Unit IV Overhauling of gravimetric feeder, Bunker gates, HAG, CAG, HAD, CAD, and painting of cold air duct and feeder during the forthcoming overhaul
2025_EB_559097_1
CE/SE/O/TTPS/Spec.No.122/25-26
Open Tender
Miscellaneous Works
Item Rate
20 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9,100
Yes
26 Nov 2025
17 May 2025
3 Jun 2025
17 May 2025
2 Jun 2025
17 May 2025
Charges for welding of eroded and worn out portion of duct joints, and welded joints by welding with ms welding electrodes.
b)DISMANTLING OF INSULATION ESTIMATE FOR 10 SQ .MTR
C)REINSULATION 10 M
Insulation work for the area where the work area is above 5 mtr from the ground or from the approach platform.( 1 No = 10 mtr2 )
Charges for overhauling of gravimetric feeder after dismantling all the Idle rollers pulleys, bearings, checking of clean out conveyors and changing of bearings in the clean out conveyor shaft, chain link and changing of Belt and other wornout parts and reassembling the same in complete shape and oil filling in the gear box. This includes transportation of materials from and to stores and consumables.
Charges for draining the feeder gear box oil, removing the feeder gear box from position, dismantling the gear box, cleaning the gear box, inspection of bearings, gears, assembling the gear box, oil refilling and fixing in position as per the direction of Engineer in-charge, including cost of consumables.
Charges for dismantling the cold air gate, gear box, chain links and gates cleaning the above, applying grease changing the worn out parts and complete O/H of gear box and assembling the above parts and confirming free movement of gates etc.
Charges for cutting & removing the old eroded gate seal frame, arranging the new gate seals in orderly and seal welding to form leaf edge seal assembly in the HAG. (Top seal outer 2 Nos. per gate).
Charges for Renewal of Top seals inner (2 Nos. per gate).
Charges for Renewal of Bottom seals inner (2 Nos. per gate).
Charges for Renewal of Left & Right side seals inner (4 Nos. per gate).
Charges for dismantling man hole doors variant link flaps, flap shaft damper flaps side, grinding for free movement links flap checking for efficient link power transmission and reassembling the above parts as per the direction of engineer in charge in Hot air damper. Dismantling of hot air gate cylinder, dismantling the end caps, shaft and piston and cleaning of cylinder inside, changing piston seals, checking the gate sideways and grinding for free movement and assembling above parts
Charges for providing of scaffolding, transportation of new / reconditioned expansion joint from stores to site, arresting of the ducts by providing necessary supports with structural materials and welding, erection of structure for providing chain blocks and safe working platform, marking, cutting and removal of wornout expansion joints, transportation and devolution of scrap joints & pieces to stores including cost of consumables and hire charge for T&P's. 1170 x 1170 Style 2
Charges for overhauling of 1 No. bunker/feeder gate after dismantling the guide roller bearings, cleaning of bearings, changing wornout bearings if any and reassembling the same.
Charges for painting two coat of good quality of enamal paint to the gravimetric feeders cold air ducts, branch ducts, seal air suction header, discharge header, seal air line dampers, instrumentation air line, water line, cold air line leading to gravimetric feeder, painting to be done after cleaning the area with wire brush and emery sheet as per the direction of Engineer in-charge includes cost of paint & all consumables
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .