Tender Value
₹8.4 Cr
EMD Value
₹16.9 L
Closing Date
14 Aug 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments'' in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Note: - As per JPO Note No. JBP/W/R/T-14 dated 16.09.2022 for tenders, a condition stating that "Non submission of Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet by the tenderer shall result in summarily rejection of his / their bid" shall be introduced and tender cases shall be dealt accordingly. However, cases may arrive such as the tenderer may have submitted Annexure VI B or Information in Similar format, but not audited balance sheets, or otherwise, or have submitted audited balance sheets for incomplete years, but not submitted information in Annexure VIB etc. in such cases, Tender committee may decide to ask for audited balance sheet or Information as per annexure VIB (as the case may be) from chartered accountant. If the information is not received timely, tender committee may deal the case accordingly.
The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (a) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (b) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (c) One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Note: - Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of opening of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Similar nature of work as defined as: (A) Work of OHE for Railway Electrification of existing line/new line/yard modification or (B) DC/AC conversion or (C) Steel replacement work in DC OHE of involving foundation, steel erection, bracket erection, wiring/OHE modification etc. or (D)Construction/replacement of transmission line of voltage equal to or above 110 KV or (E) 25 KV AC OHE work, Erection/replacement of ATD, replacement of conventional neutral section by PTFE type neutral section. (Authority: CEE/WCR/JBP's letter No. WCR/L/10/Tender Policy/3689 dtd.11.04.2012).
5 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are instructed to kindly peruse the contents of attached document "Special Conditions of Letter of Credit as Mode of Payment" before exercising the option of payment through letter of credit as mode of payment.
(i)For participating in tender for an electrical nature of work, the contractor shall have to possess valid Electrical License of appropriate voltage issued by any State Government under clause 45 of compliance of rule of Indian Electricity rules 1956 or as amended from time to time. Electrifications of 11 KV and above including OHE, "A" class electrical contractor license is essential. (ii) The license can be possessed with one of the partners or in his own name if sole proprietor. Firm should submit a self-attested copy of the electrical contractor license along with the offer, otherwise, the offer will be summarily rejected.
TRD/OHE work in connection with isolation of loop line (UP/DN) from main line over Jabalpur division and Raising of platform from RL/LL to HL at Aslana (ANA), Bandakpur (BNU), Ghatera (GEA), Gosalpur (GSPR), Niwar (NWR), Patohan (PTHD), Bakhleta (BQQ), Rethi (REI), Narioli (NOI), Phatharia (PHA), Sagoni (SAO), Bharsendi (BSDL), Jukehi(JKE), Jaitwara(JTW), Tikariya(TKYR), Bagratawa (BGTA), Guramkhedi (GMD) and Ghatpindrai (GPC) stations or any other station of Jabalpur division.
JBP-TRD-Tender-2026-11
JBP-TRD-Tender-2026-11
Open
Works - General
12 Months
Jabalpur, Madhya Pradesh
₹0
₹16.9 L
14 Aug 2026
22 Jul 2026
31 Jul 2026
170 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 6,63,91,186.54 | ||
| — | 250.00 | — | — | ||
| Cement concrete foundation in other than hard soil. | — | — | — | 20,89,350 | |
| — | 20.00 | — | — | ||
| Cement concrete foundation in hard soil. | — | — | — | 1,84,877.8 | |
| — | 30.00 | — | — | ||
| Supply of galvanized steel structure (traction mast, upright, dwarf mast, DA, AT mast etc.). | — | — | — | 41,54,806.8 | |
| — | 30.00 | — | — | ||
| Erection of galvanized steel structure (traction mast, upright, dwarf mast, DA, AT mast etc.) under power block. | — | — | — | 3,43,876.8 | |
| — | 6.00 | — | — | ||
| Supply of fabricated steel works/SPS other than mast including super mast & cross arm. | — | — | — | 8,00,745.72 | |
| — | 6.00 | — | — | ||
| Erection of fabricated steel works/SPS other than mast including super mast & cross arm under power block. | — | — | — | 80,618.1 | |
| — | 320.00 | — | — | ||
| Supply of cantilever/ bracket assembly (Conventional). | — | — | — | 1,09,95,456 | |
| — | 320.00 | — | — | ||
| Erection of cantilever/ bracket assembly (Conventional) under power block. | — | — | — | 12,49,024 | |
| — | 200.00 | — | — | ||
| Supply of solid core cut in/suspension 9T feeder insulator. | — | — | — | 26,11,790 | |
| — | 200.00 | — | — | ||
| Erection of solid core cut in/suspension 9T feeder insulator under power block. | — | — | — | 2,88,658 | |
| — | 200.00 | — | — | ||
| Supply of earthing bond and other bond. | — | — | — | 1,83,440 | |
| — | 200.00 | — | — | ||
| Erection of earthing bond and other bond. | — | — | — | 40,234 | |
| — | 10.00 | — | — | ||
| Supply of material for termination of single conductor including feeder wire/LS wire. | — | — | — | 1,49,940.6 | |
| — | 10.00 | — | — | ||
| Erection of material for termination of single conductor including feeder wire/LS wire under power block. | — | — | — | 30,532.7 | |
| — | 15.00 | — | — | ||
| Supply of material for termination of double conductor of OHE. | — | — | — | 2,56,379.7 | |
| — | 15.00 | — | — | ||
| Erection of material for termination of double conductor of OHE under power block. | — | — | — | 49,671 | |
| — | 10.00 | — | — | ||
| Dismantling of single conductor including feeder wire/LS wire under power block. | — | — | — | 5,590 | |
| — | 15.00 | — | — | ||
| Dismantling of double conductor including feeder wire/LS wire under power block. | — | — | — | 8,385 | |
| — | 10.00 | — | — | ||
| Supply of ATD three pulley type assembly complete for conventional type OHE with counter weight assembly. | — | — | — | 7,65,708.5 | |
| — | 10.00 | — | — | ||
| Erection of ATD three pulley type assembly complete for conventional type OHE with counter weight assembly under power block. | — | — | — | 1,35,760.1 | |
| — | 15.00 | — | — | ||
| Dismantling of 3 Pully ATD assembly under power block. | — | — | — | 94,906.95 | |
| — | 25.00 | — | — | ||
| Supply of guy rod assembly. | — | — | — | 3,24,016 | |
| — | 25.00 | — | — | ||
| Erection of guy rod assembly under power block. | — | — | — | 98,365.75 | |
| — | 25.00 | — | — | ||
| Dismantling of guy rod assembly under power block. | — | — | — | 22,467.25 | |
| — | 2000.00 | — | — | ||
| Erection of LS wire 130 sq.mm.under power block. | — | — | — | 43,280 | |
| — | 760.00 | — | — | ||
| Shifting of OHE from existing location to new location with all equipment under power block. | — | — | — | 29,92,743.2 | |
| — | 1500.00 | — | — | ||
| Supply of Retroreflective number plate with complete fittings. | — | — | — | 16,44,105 | |
| — | 1500.00 | — | — | ||
| Erection of Retroreflective number plate with complete fittings. | — | — | — | 1,63,605 | |
| — | 10.00 | — | — | ||
| Supply of earth contact assembly in an isolator. | — | — | — | 1,34,092.1 | |
| — | 10.00 | — | — | ||
| Erection of earth contact assembly in an isolator under power block. | — | — | — | 8,329.5 | |
| — | 50.00 | — | — | ||
| Supply of earth electrode, earth pit, earth pit cover as earthing as per drawing no. ETI/OHE/P/7020-conventional earthing. | — | — | — | 4,11,323.5 | |
| — | 50.00 | — | — | ||
| Erection of earth electrode, earth pit, earth pit cover as earthing as per drawing no. ETI/OHE/P/7020-conventional earthing. | — | — | — | 2,74,234.5 | |
| — | 15.00 | — | — | ||
| Erection of portal /TTC boom under power block by road crane arranged by contractor at his own cost. | — | — | — | 7,09,310.85 | |
| — | 1.00 | — | — | ||
| Dismantling of portal/TTC boom under power block by road crane. | — | — | — | 15,729.68 | |
| — | 750.00 | — | — | ||
| Dismantling of bracket under power block. | — | — | — | 8,14,500 | |
| — | 4.00 | — | — | ||
| Dismantling of mast/upright by gas cutting under power block. | — | — | — | 66,868.8 | |
| — | 120.00 | — | — | ||
| Erection of copper jumper wire under power block with all fittings required for erection (fittings will be supplied by contractor). | — | — | — | 1,62,000 | |
| — | 30.00 | — | — | ||
| Supply of 25 kV post insulator for 25 kV isolator and bus bar assembly. RI no. 6090 as per RDSO spec. no. TI/SPC/OHE/INS/0070(04/2007) with A&C slip no. 1 & 2 and drg no. ETI/OHE/P/6090-1. | — | — | — | 2,92,895.4 | |
| — | 30.00 | — | — | ||
| Erection of 25 kV post insulator for 25 kV isolator and bus bar assembly. RI no. 6090 as per RDSO spec. no. TI/SPC/OHE/INS/0070(04/2007) with A&C slip no. 1 & 2 and drg no. ETI/OHE/P/6090-1 under power block. | — | — | — | 40,571.7 | |
| — | 300.00 | — | — | ||
| Supply of Retro reflective 25 kV caution board, unwired board, engine stop, sigma board etc. other similar board. | — | — | — | 5,12,367 | |
| — | 300.00 | — | — | ||
| Erection of Retro reflective 25 kV caution board, unwired board, engine stop, sigma board etc. other similar board. | — | — | — | 57,126 | |
| — | 1000.00 | — | — | ||
| Painting and marking of implantation, emergency phone socket direction, rail level, km's, number of structures, OHE height and ATD's temp. marking on ATD structure (including paint). | — | — | — | 98,710 | |
| — | 4000.00 | — | — | ||
| Picking up, loading, unloading and transportation of OHE material. | — | — | — | 4,05,760 | |
| — | 150.00 | — | — | ||
| Supply of material for solid copper bus bar 18 mm. | — | — | — | 2,07,270 | |
| — | 150.00 | — | — | ||
| Erection of material for solid copper bus bar 18 mm under power block. | — | — | — | 32,193 | |
| — | 300.00 | — | — | ||
| Supply of material for solid copper bus bar connectors bus terminal. | — | — | — | 9,15,546 | |
| — | 300.00 | — | — | ||
| Erection of material for solid copper bus bar connectors bus terminal under power block. | — | — | — | 27,597 | |
| — | 60.00 | — | — | ||
| Erection of material for section insulator assembly including cut in insulator and all fittings on catenary & contact wire under power block. | — | — | — | 4,55,031 | |
| — | 70.00 | — | — | ||
| Supply of 25 kV 1600 Amp. single pole isolator with insulator (1 set isolator consist of 02 Nos. 25 kV post insulator and 01 Nos. 25 kV Rod insulator) as per RDSO drg No. ETI/OHE/16[1/94] Rev. 2 [March 04] and RDSO specific no ETI/OHE/16 (1/94) Rev.2 [March 04] and RDSO lettr No. TI/PSI /25/ISOL / POLICY/99 dt. 03.06.99 and CORE -ALD approved letter No. ELCORE/ALD/FIT/590 PT.C. | — | — | — | 56,15,262.8 | |
| — | 70.00 | — | — | ||
| Erection of 25 kV 1600 Amp. single pole isolator with insulator (1 set isolator consist of 02 Nos. 25 kV post insulator and 01 Nos. 25 kV Rod insulator) as per RDSO drg No. ETI/OHE/16[1/94] Rev. 2 [March 04] and RDSO specific no ETI/OHE/16 (1/94) Rev.2 [March 04] and RDSO lettr No. TI/PSI /25/ISOL / POLICY/99 dt. 03.06.99 and CORE -ALD approved letter No. ELCORE/ALD/FIT/590 PT.C under power block. | — | — | — | 2,85,583.9 | |
| — | 500.00 | — | — | ||
| Supply of 5 mm copper dropper wire. | — | — | — | 5,53,180 | |
| Each Span | 380.00 | — | — | ||
| Erection of new 5 mm copper dropper wire & readjustment of dropper wire with complete fittings under power block. | — | — | — | 3,01,222.2 | |
| — | 760.00 | — | — | ||
| Modification/adjustment of BKTs/OHE & Tower wagon checking under power block. | — | — | — | 7,04,808.8 | |
| — | 4.00 | — | — | ||
| Supply of double pole isolator assembly per existing drawing. | — | — | — | 3,97,139.88 | |
| — | 4.00 | — | — | ||
| Erection, testing and commissioning of double pole isolator assembly per existing drawing under power block. | — | — | — | 35,455.16 | |
| — | 20.00 | — | — | ||
| Dismantling of isolator under power block. | — | — | — | 33,259.8 | |
| — | 5000.00 | — | — | ||
| Shifting of feeder wire from existing location to new location along with all equipment under power block. | — | — | — | 7,71,500 | |
| — | 140.00 | — | — | ||
| Supply of Drop arm complete set for TTC or portal. | — | — | — | 1,91,00,670.4 | |
| — | 140.00 | — | — | ||
| Erection of Drop arm complete set for TTC or portal under power block. | — | — | — | 31,43,313.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-April-2022.pdf
ATTACHMENT
AdvancecorrectionslipNo1to10ofGCC2022_compressed.pdf Advance Correction Slip No 1 to 10
ATTACHMENT
AdvanceCorrectionSlipNo11toIRGCC2022_compressed1.pdf Advance Correction Slip No 11
ATTACHMENT
TenderDocument2026-11IsolationandPlatformraising_1.pdf Tender Document
ATTACHMENT
AdvancecorrectionslipNo1to10ofGCC2022_compressed.pdf
ATTACHMENT
AdvanceCorrectionSlipNo11toIRGCC2022_compressed1.pdf
ATTACHMENT
TenderDocument2026-11IsolationandPlatformraising_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .