| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.8 LAccepted-AOC | ₹8.8 L | 1 | Accepted-AOC Lowest |
| 2 | 2₹8.9 L+₹10,426.83 (1.18%)Rejected-Finance | ₹8.9 L+₹10,426.83 (1.18%) | 2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | R GUNASUNDARI L2 | T.V.SIVAKUMAR L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of walls, including all cost and labour charges., | 43 | 1.00 M3 (One Cubic meter) | 420 ₹18,060 | 419 ₹18,017 Lowest |
| 2.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 2,179 | 1.00 RM (One Running Meter) | 113 ₹2,46,227 | 111.75 ₹2,43,503.25 Lowest |
| 3.00 | Towards cost and supply of 90 mm PVC pipe 6Kg from app company including of all charges etc. | 699 | 1.00 RM (One Running Meter) | 195 ₹1,36,305 Lowest | 195 ₹1,36,305 Lowest |
| 4.00 | Towards cost and supply of 63 mm PVC pipe 6Kg from app company including of all charges etc. | 1,480 | 1.00 RM (One Running Meter) | 100 ₹1,48,000 | 99.5 ₹1,47,260 Lowest |
| 5.00 | Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste. | 2,179 | 1.00 RM (One Running Meter) | 20 ₹43,580 | 19.1 ₹41,618.9 Lowest |
| 6.00 | Refilling with excavated earth other then sand Complying With Standard Specifications including all labour charges etc.completed | 2,179 | 1.00 RM (One Running Meter) | 25 ₹54,475 | 23.06 ₹50,247.74 Lowest |
| 7.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part M.sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 22 | 1.00 M3 (One Cubic meter) | 4,850 ₹1,06,700 | 4,825.18 ₹1,06,153.96 Lowest |
| 8.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part M.sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 22 | 1.00 M3 (One Cubic meter) | 6,250 ₹1,37,500 | 6,241.56 ₹1,37,314.32 Lowest |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
15 Jun 2023, 3:00 pmClosed
Executive Officer Thiyagadurgam Town Panchayat
Town Panchayat Office Thiyagadurgam
PROVIDING OF PIPE LINE AT SANDHAIMEDU, KASTHURIBAI NAGAR COLONY AND PUKKULAM COLONY IN THIYAGADURGAM TOWN PANCHAYAT
2023_DTP_323100_2
179/2022/A1
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
87 days
Thiyagadurgam Town Panchayt
Authorized Contractors
3 documents required · 3 mandatory
₹0
₹11,000
Yes
Town Panchayat Office Thiyagadurgam
3 Oct 2025
6 Jun 2023
16 Jun 2023
6 Jun 2023
15 Jun 2023
6 Jun 2023
9 Jun 2023
Amount
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of walls, including all cost and labour charges.,
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Towards cost and supply of 90 mm PVC pipe 6Kg from app company including of all charges etc.
Towards cost and supply of 63 mm PVC pipe 6Kg from app company including of all charges etc.
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling with excavated earth other then sand Complying With Standard Specifications including all labour charges etc.completed
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part M.sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Plain Cement Concrete 1:2:4 Mix (one part cement, two part M.sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
R GUNASUNDARI
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .