Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | Rejected-Technical MAIN ROAD KATHARA BOKARO 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | - | Rejected-Technical Not evulated | |
| 3 | Rejected-Technical | - | Rejected-Technical not eveluated |
Tender Value
Refer Docs
EMD Value
₹5,100
Closing Date
15 Jul 2022, 4:00 pmClosed
PE(EnM), Jarangdih Colliery
Office of the PE(EnM), Jarangdih Colliery
Day to day 440 volts O/H line maintenance, re-erection , assembling / dismantling of O/H lines conductors , poles and associated parts like insulators , brackets etc to maintain safe and smooth power supply to Jarangdih colony , water supply , ho
2022_CCL_248822_1
JRD/PEEnM/ETen/22-23/634
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Jarangdih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,100
6 Sept 2022
5 Jul 2022
16 Jul 2022
5 Jul 2022
15 Jul 2022
5 Jul 2022
5 Jul 2022 - 11 Jul 2022
Amount
Erection of metallic pole of following length in cement concrete 1;3;6 (1 cement ,3 coarse sand , 6 graded stone aggregate 40 mm normal size) foundation including excavation and refilling etc. 10.00 meters and 12.00 meters
Erection of conductor of 7/3, 35 mm to 7/4 .00 diameter and above including binding etc ,. 16 span ( 40 m x 4 wire) =160 mtrs. X 16 span = 2.56 km dog Conductor-2.56 km x 394/km.= 1008.64 kgs.
Supply and erection of 100mmx80mm pin insulator complete with G.I spindle and nuts etc as required
Supply and erection of 75mmx90mm shackle insulator with G. I bolts, nuts, and straps etc. as required
Supplying of channel iron 75mm x40mm x 6 mm ( 7.14kg per meter) cross arm for two overhead line conductors complete with50mmx50mm x6mm angle iron bracket welded to the channel iron and complete with 50mmx6mm M.S. flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts and nuts etc and painting with primer and finish paint
Erection of pole top/straight two wire/V shape two wire, angle iron/ channel iron, cross arm on steel tubular/ rail / .. Pcc pole etc. as required
Dismantling of O/H line comprising of AL O/H conductor. 16 span x (40 m x 4 wire) =160 mtrs = 2.56 KM x 394/ KM = 1008.64 Kgs.
Dismantling of pole / street light slandered /strut embedded in cement concrete foundation as required
Supplying and erection of stay set complete (galvanized ) with 19/20 mm dia. x 1.8meters long stay rod, anchor plate of size 45 cm x 45cm x 7.5 mm thick, thimble, stay clamps, turn buckle, (20 mm x 60 cm), 7/4.00 mm dia. G.I. Stay wire and strain insulator etc in cement concrete 1:3:6(1 cement : 3 coarse sand: 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc
Total impact of GST for the purpose of CTC
M/S P. L. CONSTRUCTION
M/S VISHAL ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_257054.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .