Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-AOC PANDAVESWAR BARDHAMAN WEST BENGAL INDIA 713346 | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | 1 | Accepted-AOC Eligible L-1 Bidder | |
| 2 | 2₹3.6 L+₹17,076.14 (4.94%)Rejected-Finance CHINCHURIA SONEPUR BAZARI 713378 WEST BENGAL INDIA | CHINCHURIA | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | 2 | Rejected-Finance Quoted Rate more than L-1 Bidder | |
| 3 | 3₹3.7 L+₹24,392.14 (7.06%)Rejected-Finance VILL CHINCHURIA PO CHINCHURIA JAMURIA PASCHIM BARDHAMAN WB 713378 | JAMURIA | PASCHIM BARDHAMAN | WB | 713378 | 3 | Rejected-Finance Quoted Rate more than L-1 Bidder |
Tender Value
₹3.3 L
EMD Value
₹4,200
Closing Date
7 Dec 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE EnM
Sonepur Bazari Area
Diversion, Erection and Dismantling of F-10 as shown in the attached mine plans at S.B. Project.
2023_ECL_294534_1
GM/SBA/EnM/eTender/23-24/296
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Sonepur Bazari Area
Please refer tender documents.
6 documents required · 6 mandatory
₹4,200
19 Mar 2024
25 Nov 2023
9 Dec 2023
27 Nov 2023
7 Dec 2023
27 Nov 2023
27 Nov 2023 - 30 Nov 2023
Amount
Item Description/ Heading
Material Cost
Erection of 11/12/13/16 m long Steel Tubular Pole with cement concrete
Supply, fabrication,hoisting and erection of phase and earth bracket and painting with red oxide primer
Supply and erection of nuts, bolts, flats and erection of clamps
Supply of HT Stay Set complete with stay pate, stay insulator, stay wire of required dimension and specification
Labour Cost:-
Erection of 11/12/13/16 m long Steel Tubular Pole with cement concrete
Fabrication,hoisting and erection of phase and earth bracket and painting with red oxide primer
Erection of nuts, bolts, flats and erection of clamps
Installation of 11KV disc insulator and hardware
Installation of 11KV Pin insulator and hardware
Fixing of HT Stay Set complete with stay pate, stay insulator, stay wire of required dimension and specification
Stringing of ACSR Dog/Wolf conductor
Dismantling of 16m/13m long Steel Tubular pole with cement concrete
Dismantling of phase and earth bracket, angles, channel etc.
Dismantling of 11KV disc/pin insulator and hardware
Labour cost for handing of disnantled pole and shifting to 6 MVA substation(15day*10 unskilled*494).
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
CHAKRABORTY AND COMPANY
M/S MAA DALDALI ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_305091.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .