Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.1 LAccepted-AOC 12 VIVEKANANDA ROAD FLAT NO C 2 3RD FLOOR VIVEKANANDA ROAD KOLKATA KOLKATA WEST BENGAL 700075 | KOLKATA | WEST BENGAL | 700075 | L-1 | Accepted-AOC L-1 for 1.03,1.04,1.07,1.09 to 1.14 and 1.16 | |
| 2 | L-2₹5.6 L+₹3.5 L (167.5%)Accepted-AOC E 14 15 MIDC HINGNA INDUSTRIAL AREA NAGPUR MAHARASHTRA 440016 | NAGPUR | MAHARASHTRA | 440016 | L-2 | Accepted-AOC L-1 for 1.01,1.02,1.05,1.06,1.08 and 1.15 | |
| 3 | Rejected-Technical | - | Rejected-Technical EMD and past order not submitted | |
| 4 | Rejected-Technical | - | Rejected-Technical EMD not submitted |
| Sl No | Description | Qty | Unit | GRW Pumps Pvt Ltd L1 | TECHNO ENGINEERING AND RUBBER INDUSTRIES L2 |
|---|---|---|---|---|---|
| 1.00Purchase of Spare Parts of “WPIL” make Clear Water Pump (Model 4U22) installed in Recovery Pump House. | |||||
| 1.01 | Impeller 1 Stage | 2 | Nos | 1,10,000 ₹1,36,939 | 99,000 ₹1,16,820 Lowest |
| 1.02 | Impeller 2 Stage | 2 | Nos | 1,10,000 ₹1,36,939 | 99,000 ₹1,16,820 Lowest |
| 1.03 | Pump Shaft | 2 | Nos | 18,310 ₹22,794.12 Lowest | 39,200 ₹46,256 |
| 1.04 | Shaft Sleeve | 4 | Nos | 3,565 ₹4,438.08 Lowest | 13,440 ₹15,859.2 |
| 1.05 | Casing Wearing Ring | 4 | Nos | 21,200 ₹26,391.88 | 10,080 ₹11,894.4 Lowest |
| 1.06 | Lantern Ring | 8 | Nos | 7,635 ₹9,504.82 | 3,920 ₹4,625.6 Lowest |
| 1.07 | Impeller Key | 8 | Nos | 300 ₹373.47 Lowest | 1,000 ₹1,180 |
| 1.08 | Coupling Key | 4 | Nos | 1,105 ₹1,375.62 | 1,000 ₹1,180 Lowest |
| 1.09 | Shaft Sleeve Nut | 4 | Nos | 1,630 ₹2,029.19 Lowest | 2,800 ₹3,304 |
Tender Value
₹9.6 L
EMD Value
₹24,000
Closing Date
28 Jul 2021, 3:00 pmClosed
SE(PURHASE)
STPS,MPPGCL,SARNI
Purchase of Spare Parts of WPIL make Clear Water Pump Model 4U22 installed in Recovery Pump House of Unit 10 and 11 of STPS-IV, Sarni.
2021_MPPGC_140972_1
PT-3472
Open Tender
Miscellaneous Goods
Item Rate
60 days
STPS, MPPGCL, SARNI
AS PER NIT
4 documents required · 4 mandatory
₹500
Yes
₹24,000
Yes
6 Oct 2025
28 May 2021
30 Jul 2021
28 May 2021
28 Jul 2021
28 May 2021
Purchase of Spare Parts of “WPIL” make Clear Water Pump (Model 4U22) installed in Recovery Pump House.
Impeller 1 Stage
Impeller 2 Stage
Pump Shaft
Shaft Sleeve
Casing Wearing Ring
Lantern Ring
Impeller Key
Coupling Key
Shaft Sleeve Nut
Bearing Housing (D.E)
Bearing Housing (N.D.E)
Bearing Housing Cover (D.E.)
Bearing Housing Cover (N.D.E)
End Cover
Bearing Lock Washer & Nut
Sealing Connector
TECHNO ENGINEERING AND RUBBER INDUSTRIES
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .