| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.5 LAccepted-AOC CONTRACTOR VILLUPURAM | ₹84.5 L Quoted ₹99.7 L | L1 | Accepted-AOC AWARD OF CONTRACT |
| 2 | L2₹1.1 CrRejected-Finance | ₹1.1 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.2 CrRejected-Finance | ₹1.2 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.3 CrRejected-Finance | ₹1.3 Cr | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical BQR conditions not satisfied |
| Sl No | Description | Qty | Unit | SHAKTHI CONSTRUCTION L2 | J.S.NAGARAJAN L3 | M.RAMALINGAM L1 | S.DAVIDWORKS CONTRACT L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in hard stiff clay black cotton hard red earth shale's murram gravel stony earth and earth mixed with small size boulders and hard gravelly soil including all cost of lead lift etc complete. | 607 | m3 | 90 ₹54,630 | 100 ₹60,700 | 130 ₹78,910 | 150 ₹91,050 |
| 2.00 | Collection, supply and spreading of M Sand for all including cost of materials, labour, lead, lift etc., complete. | 55 | m3 | 1,900 ₹1.0 L | 1,500 ₹82,500 | 500 ₹27,500 | 2,200 ₹1.2 L |
| 3.00 | PCC 1:3:6 mix using 40mm HBG metal including cost of all materials.labour lead lift curing hire charges for mixer machine etc complete | 80 | m3 | 6,000 ₹4.8 L | 6,000 ₹4.8 L | 6,000 ₹4.8 L | 6,000 ₹4.8 L |
| 4.00 | PCC 1:2:4 using 20mm (machine crushed) metal for without form work including cost of all labour, materials, lead, lift etc., complete. | 18 | m3 | 7,000 ₹1.3 L | 7,000 ₹1.3 L | 5,500 ₹99,000 | 7,200 ₹1.3 L |
| 5.00 | PCC 1:2:4 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. Complete. | 8 | m3 | 8,500 ₹67,957.50 | 8,500 ₹67,957.50 | 8,000 ₹63,960 | 9,000 ₹71,955 |
| 6.00 | RCC 1:1.5:3 using 20mm (machine crushed) metal for raft concrete without formwork including cost of all labour, materials, lead, lift etc., complete. | 85 | m3 | 10,000 ₹8.5 L | 9,000 ₹7.7 L | 6,000 ₹5.1 L | 9,750 ₹8.3 L |
| 7.00 | RCC 1:1.5:3 using 20mm (machine crushed) metal for with formwork including cost of all labour, materials, lead, lift etc., complete. | 105 | m3 | 10,500 ₹11.0 L | 15,000 ₹15.8 L | 9,000 ₹9.4 L | 16,500 ₹17.3 L |
| 8.00 | RCC 1:1.5:3 using 20mm (machine crushed) metal for precast slab for cable duct cover slab including cost of all materials, lead, lift, labour with formwork etc., complete. | 21 | m3 | 13,000 ₹2.7 L | 15,000 ₹3.1 L | 10,000 ₹2.1 L | 16,000 ₹3.4 L |
| 9.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete | 15,826 | Kgs | 84 ₹13.3 L | 71 ₹11.2 L | 60 ₹9.5 L | 85 ₹13.5 L |
| 10.00 | Brickwork in CM 1:5 mix using II class champer bricks size 9"X4"3/8" X 2"3/4" for retainging wall including cost of materials, labour, lead, lift, curing etc., complete. | 289 | m3 | 7,880 ₹22.8 L | 8,250 ₹23.8 L | 8,000 ₹23.1 L | 9,000 ₹26.0 L |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
10 Feb 2026, 2:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
Civil work for Kadaladi 110 KV SS
2026_EB_649602_1
CE/TP SO/MDU Specn.No.013/2025-26
Open Tender
Civil Works - Others
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 L
4 Jun 2026
31 Jan 2026
11 Feb 2026
31 Jan 2026
10 Feb 2026
31 Jan 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid