Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC 33 NARAYAN PURA UJJAIN M P | UJJAIN | UJJAIN | MADHYA PRADESH | ₹13.6 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹13.8 LRejected-Finance UJJAIN | MADHYA PRADESH | 456001 | ₹13.8 L | L2 | Rejected-Finance L2 Bidder |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SHREE JI ENTERPRISES L1 | Shree Arihant Urja Consultant L2 |
|---|---|---|---|---|---|
| 1.00 | Disconnecting,discharging the 33 kv Supply,opening the connection HV & LV side of 2 MVA 33/3.3 kV Transformer | 1 | Job | 29,399 ₹29,399 | 25,000 ₹25,000 |
| 2.00 | complete opening all Radiatoers & drain out old oil,lifting transformer from plinth and loading,unloading & transpotation of transformer up to workshop | 1 | Job | 39,150 ₹39,150 | 35,000 ₹35,000 |
| 3.00 | opening the top cover of transformer, lifting and taking out core from tank,dismantling the stamping of core and removing all damaged 3 phase coil HV & LV Side of transformer | 1 | Job | 29,399 ₹29,399 | 25,000 ₹25,000 |
| 4.00 | Manufacturing of new HV side coils using TPC copper conductor/Dual coat SE copper conductor & applying suitable class of insulation complete heating & processing work of coil. | 54 | Nos | 8,950 ₹4.8 L | 7,500 ₹4.0 L |
| 5.00 | Manufacturing of new LV side coils using TPC copper conductor/Dual coat SE copper conductor & applying suitable class of insulation complete over heating & processing work of coil. | 3 | Nos | 14,680 ₹44,040 | 14,700 ₹44,100 |
| 6.00 | Refixing of all HV & LV side coil into the core making all the connection of coils & applying proper insulation to core,HV and LV coils & connection leads and reassemble the core complete heating the core for better I.R. value. | 1 | Job | 68,590 ₹68,590 | 65,000 ₹65,000 |
| 7.00 | Fixing core into the tank,complete replaceing of HV bushing of transformer Also replaceing new gas kit nacking complete refitting,checking,testing &over heating of transformer at workshop etc complete job | 1 | Job | 1,22,450 ₹1.2 L | 1,12,500 ₹1.1 L |
| 8.00 | filling of new fresh insulating transformer oil including filtration oil complete job | 2,695 | ltr | 90 ₹2.4 L | 140 ₹3.8 L |
| 9.00 | complete checking testing and repairing of OLTC Wiring and components for proper operation of OLTC raise & lower of transformer taping of 2000 KVA 33/3.3 kv transformerand complete providing and fixing of new contactors ect along with wiring fuse in place of defective contactors etc along with wiring fuse of OLTC of 2000 kva 33/3.3 kv transformer and complete job including testing at site Gaughat TP | 1 | Job | 58,780 ₹58,780 | 55,000 ₹55,000 |
| 10.00 | making arrange of silica jell breather including cutting and welding pipe | 1 | Job | 5,875 ₹5,875 | 4,500 ₹4,500 |
Tender Value
₹13.7 L
EMD Value
₹27,370
Closing Date
30 Jan 2026, 5:30 pmClosed
EE PHE Maintenance Division
Rajasv Colony Dashara Maidan Ujjain
Repairing of 33/3.3 kV,2MVA Stand by transformer Ambodiya WTP
2025_UAD_471978_1
PHE/E-TENDER 160/2025
Open Tender
Civil Works - Water Works
30 days
Ujjain
Please Refer Tender Document
4 documents required · 4 mandatory
₹2,000
₹27,370
3 Jun 2026
31 Dec 2025
2 Feb 2026
31 Dec 2025
30 Jan 2026
31 Dec 2025
Disconnecting,discharging the 33 kv Supply,opening the connection HV & LV side of 2 MVA 33/3.3 kV Transformer
complete opening all Radiatoers & drain out old oil,lifting transformer from plinth and loading,unloading & transpotation of transformer up to workshop
opening the top cover of transformer, lifting and taking out core from tank,dismantling the stamping of core and removing all damaged 3 phase coil HV & LV Side of transformer
Manufacturing of new HV side coils using TPC copper conductor/Dual coat SE copper conductor & applying suitable class of insulation complete heating & processing work of coil.
Manufacturing of new LV side coils using TPC copper conductor/Dual coat SE copper conductor & applying suitable class of insulation complete over heating & processing work of coil.
Refixing of all HV & LV side coil into the core making all the connection of coils & applying proper insulation to core,HV and LV coils & connection leads and reassemble the core complete heating the core for better I.R. value.
Fixing core into the tank,complete replaceing of HV bushing of transformer Also replaceing new gas kit nacking complete refitting,checking,testing &over heating of transformer at workshop etc complete job
filling of new fresh insulating transformer oil including filtration oil complete job
complete checking testing and repairing of OLTC Wiring and components for proper operation of OLTC raise & lower of transformer taping of 2000 KVA 33/3.3 kv transformerand complete providing and fixing of new contactors ect along with wiring fuse in place of defective contactors etc along with wiring fuse of OLTC of 2000 kva 33/3.3 kv transformer and complete job including testing at site Gaughat TP
making arrange of silica jell breather including cutting and welding pipe
cleaning and painting of transformer including two coat of heat and oil testing insulation paint inside the tank
Replacing of all hardware materials like nut bolt uper and bottom wall
providing and fixing of bucolz relay
providing and fixing of surge relay
providing and fixing of winding tempreture meterand winding tempreture indication meter with senser.
providing and fixing of MOG (magnetic oil gauge)
Complete checking & testing of transformer only routine test
Loading,unloading & transpotation of repaired transformer upto site and installation of transformer upto site and installation of transformer at substation complete reconnection LV&HV Side connection as per IE Rule complete checking testing & trial of transformer at site.
complete checking testing of 2000 KVA 33/3.3 kv transformer RTCC panel complete checking the wiring of panel and repairing remote control system of 2000 kva 33/3.3 kv transformer and complete job including testing of RTCC panel
supply of fiber safety helmet
supply of gum boot
supply of petroleam jelly
supply of silica jell for transformer breather
Fire extinguisher DCP (9 KG)
Tap Roll pvc 3/4"
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
tender.pdf
Tender Documents • 1.19 MB
condition.pdf
Other Document • 0.70 MB
BOQ_554987.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid