Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC SARSAVAH RAJA POST JAYANT DISTT SINGRAULI MP 486890 | JAYANT | SINGRAULI | MP | 486890 | L1 | Accepted-AOC As per TC recommendation and approval. | |
| 2 | L2₹2.9 L+₹11,864 (4.24%)Rejected-Finance 56 HARSHNAGAR VEER ENGINEERING WORKS ROBERTSGANJ RAILWAY STATION ROAD SONBHADRA UTTAR PRADESH 231216 | SONBHADRA | UTTAR PRADESH | 231216 | L2 | Rejected-Finance As per NIT | |
| 3 | L3₹3.0 L+₹18,837 (6.73%)Rejected-Finance CINAMA ROAD ANPARA P O ANPARA SONEBHADRA 231220 UTTAR PRADESH INDIA | SONBHADRA | UTTAR PRADESH | 231220 | L3 | Rejected-Finance As per NIT | |
| 4 | L4₹3.9 L+₹1.1 L (38.5%)Rejected-Finance KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | L4 | Rejected-Finance As per NIT |
Tender Value
₹5.1 L
EMD Value
₹6,400
Closing Date
12 Feb 2025, 10:00 amClosed
M K Pandey
O/o AGM, Bina Area, NCL, District Sonebhadra (UP), Pincode 231220
Changing of oil seals and repairing of splines of Swing Gear Box 1 and 2 of 24/96 Gaurav Dragline of Bina Project. (Repair work to be carried out at NCL site).
2025_NCL_327555_1
Bina/SO(Excv)/Tender/24-25/73 dt 31.01.2025
Open Tender
Excavation Department Work
Item Rate
19 days
Bina Project, NCL
As per NIT
5 documents required · 5 mandatory
₹6,400
15 Apr 2025
31 Jan 2025
13 Feb 2025
1 Feb 2025
12 Feb 2025
1 Feb 2025
1 Feb 2025 - 8 Feb 2025
Amount
Labour charges including contractors profit for cleaning work (Labour consists of 6 no. un-skilled for a period of 4 shiftdays i.e. 2 days X 2 shift)
Labour Charges including contractors profit for Dismanteling the Gear Box, Swing Shafts and Swing motors and fitment of Gear Box ,swing shaft and Swing Motor after completion of work of 02 Nos. Swing System (1st and 2nd) (Labour consists of 06 no. Unskilled for a period of 16 shiftdays i.e. 8 days X 2 shift, 05 no. Semi-skilled for a period of 16 shiftdays i.e. 8 days X 2 shift, 04 no. Skilled for a period of 16 shiftdays i.e. 8 days X 2 shift and 01 no. Supervisor for a period of 16 shiftdays i.e. 8 days X 2 shift)
Labour Charges including contractors profit for Fitment of oil seal and repairing work of splines of swing housing of Gear Box 1 and 2 (Labour consists of 04 no. Unskilled for a period of 18 shiftdays i.e. 9 days X 2 shift, 02 no. Welder for a period of 18 shiftdays i.e. 9 days X 2 shift, 02 no. Grinderman for a period of 18 shiftdays i.e. 9 days X 2 shift, 03 no. Skilled for a period of 18 shiftdays i.e. 9 days X 2 shift, 03 no. Semi-Skilled for a period of 18 shiftdays i.e. 9 days X 2 shift and 01 no. Supervisor for a period of 18 shiftdays i.e. 9 days X 2 shift)
Hiring charges for accessories
Hiring charges for 02 nos Welding machine with accessories
Hiring charges for 02 nos. Gas cutting set with accessories
Hiring charges for 02 nos. grinding machine with stone
Hiring charges for 02 nos. exhaust fan
Hiring charges of 02 nos. hand lamps with holders
Hiring charges of 02 nos. Hydraulic Jack 200 Ton
Hiring charges of Charge for misc. Tools & Tackles like chipping hammers, tie rod, crowbars,spanners, manual multiplier, rope, wrench set, pipes,etc
Total impact of GST for the purpose of CTC
Veer Engineering Works (BID ID -1126049)
MANISH ENTERPRISES (BID ID -1125921)
SHASHI ENGINEERING WORKS (BID ID -1127074)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_339518.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .