Tender ID
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
22 Jan 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Providing and laying sewerage connection line for STP sector-29 from main trunk line , yeida WC-03
2026_YEIDA_1105538_11
YEA/GM(PROJECT)/2025/453 DT-09/01/2026
Open Tender
Civil Works
Fixed-rate
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,700
₹3.0 L
13 Mar 2026
13 Jan 2026
23 Jan 2026
13 Jan 2026
22 Jan 2026
13 Jan 2026
Earthwork in excavation by mechancal means (hdraulic excavater)/manual means in fundation trenches or drain (not exceeding 1.5m in width or 10 sqm in plan)including dressing of sides and ramming of atoms lift upto 1.5m incuding getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. All kind of soil. 0-1.5M BGL
Extra 20% for under subsoil condition 3.0 - 4.50M BGL
Supply and laying of ISI marked R.C.C. NP-3 pipes of following sizes including carting, loading, unloading, at godown, including all taxes and levies & rubeer rings. of following 2200 mm dia
Extra 20% for under subsoil condition. (Laying only) 2200 mm dia
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size)
Extra 20% for under subsoil condition.
Providing and laying in position specified grade of cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size)
Extra 20% for under subsoil condition.
Supplying and stacking at site. 90 mm to 45 mm size stone aggregate.
Extra 20% for under subsoil condition
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete.SOR-18/5.9.1
Extra 20% for under subsoil condition
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.up to plinth level Thermo-Mechanically Treated bars./cold twisted barsUPPWD/SOR/-2020
Extra 20% for under subsoil condition
Construction of composite section (RCC core) conical manhole 2.20m internal dia at bottom and 0.56m dia top and 9.00 mtr. deep in or under sub soli water Brick massonary with 100 class designation FPS bricks in cement mortar 1:4(cement: coarse sand) and RCC core in cement concrete proportion 1:1 1/2 :3(1 cement: 1 1/2 coarse sand:3 graded stone aggregate 20 mm nominal size) foundation concrete 1:4:8(1 cement:4 coarse sand:8 graded stone aggregate 40 mm nominal size) over 100 mm dry stone soiling of 40 mm aggregate with 20% blinding material such as moorum etc. well consolidated with necessary rammers steel shuttering etc. inlide out side plastering 12mm thick with cement mortar 1:3(1 cement:3 coarse sand) finished with a floating coat of neat cement and making cunnette in cement concrete 1:2:4 (1) cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement including providing and embedding of 12 mm poly propelene coated foot rest 300 mm centre to centre and embedded in cement (block 200X200 X100 mm) mix 1:2:4 including providing and fixing SFRC manhole cover and frame 560 mm internal dia matre(heavy duty) conforming to is 12592 with marking SEWER GNIDA total weight of cover and frame to be not less than 182Kg. fixed in cement concrete 1:2:4 including centring and shuttering complete including all excavations, blck filling bailing or pumping out of water and disposal of surplus earth with in 50m complete as per design & instruction of E/I( no extra payment shall be made on gecount of circuler work)
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) UP PWD SOR 2020/DAR-18/15 2 1
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kind of soil
Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all material, labour, tools & plants etc required for proper completion of the work UPPWD SOR/281/P-17
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete,
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access platform
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :-Cement content considered in this item is @330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.up to plinth level Thermo-Mechanically Treated bars./cold twisted bars SOR-20/5.22.6
Providing & Fixing on wall face U V stablized unplasticised -PVC pipe uPVC pipes (working pressure 4 kg / cm2) Single socketed pipe (single socketed having 3.2 mm wall thickness confirming to I S 13592 (4 Kg/sqcm including joint with seal ring confirming to IS: 5382 leaving 10 mm gap for thermal expansions uPVC pipes (working pressure 4kg/cm2) Single socketed pipe SOR 110 mm dia UPPWD/SOR/2020
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.61 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
11.pdf
Tender Documents • 1.79 MB
BOQ_2040480.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .