| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | ₹10.0 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹11.5 L+₹1.5 L (14.7%)Rejected-Finance | ₹11.5 L+₹1.5 L (14.7%) | L2 | Rejected-Finance Not being L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Being not eligible Due to not enlisted in requisite category ie d(iii) |
| Sl No | Description | Qty | Unit | ABDUL RAHIM L2 | JyothsnaNursery L1 |
|---|---|---|---|---|---|
| 1.00 | Supply and planting of baffalo grass by dibbling root method complete or all as specified below and directed :-
(a) Level the complete area and excavate the area not less than 60 cm deep in any type of soil.(b) Remove unwanted waste materials like metals, deberies, stones, plastic waste, weed, etc.(c) A mixture of red earth and farm yard manure in the proportion of 2 :1 should be filled in the excavated area.
(d) Watering the area after final dressing of soil after one week continuously till the soil get watered/wet upto 10 to 15 cm deep and eradication of weeds/vegetation etc if any (e) Final dressing of top of surface of soil to required slope and gradient towards the manholes(f) Plantation of grass at the rate of 10 cm c/c both ways by dibbing root method.(g) Remove excavated earth from site & deposited at the area directed upto a distance not exceeding 100 mtr.(h) Approved Insecticides & fungicides should be sprayed over the processed area.
Notes :- Defect Liability Period of Arboriculture is two years and maintenance of plants shall also be done by Contractor during this Peiod. The rates quoted by the contractor shall be deemed to include the cost of all above activities, materials and labour. nothing etc will be admissable on this account. | 1,900 | SQM | 500 ₹9,50,000 | 463 ₹8,79,700 Lowest |
| 2.00 | Material & Labour for 40 mm bore gun metal gate valve ISI marked with iron wheel screwed both ends for Iron pipe, complete all as specified and directed. | 6 | EACH | 2,000 ₹12,000 | 1,500 ₹9,000 Lowest |
| 3.00 | Material & Labour for 25 mm bore gun metal gate valve ISI marked with iron wheel head, screwed both ends for iron pipe, complete all as specified and directed. | 15 | EACH | 2,000 ₹30,000 | 1,000 ₹15,000 Lowest |
| 4.00 | Material & Labour for 25 mm bore steel tubes “medium grade” galvanised with all fitting and fixed in walls ceiling or laid in floors, complete all as specified and directed. | 310 | RM | 400 ₹1,24,000 | 245 ₹75,950 Lowest |
| 5.00 | Material & Labour for 40mm bore steel tubes “medium grade” galvanised with all fitting and fixed in walls or laid in floors, complete all as specified and directed. | 65 | RM | 500 ₹32,500 | 330 ₹21,450 Lowest |
Tender Value
₹9.2 L
EMD Value
₹18,400
Closing Date
25 Aug 2026, 6:00 pmClosed
Ranjeet Kumar, IDSE, CWE
Commander Works Engineers AF South Gangamma Circle Opp Guard Room 410 AFS Jalahalli Bangalore 560013
PROVISION OF ARBORICULTURE AT AFTC UNDER GE (M)AF JALAHALLI
2026_MES_781185_1
85378/E8
Open Tender
Civil Works
Item Rate
GE (M) (AF) Jalahalli
As per tender document
8 documents required · 8 mandatory
₹500
GE(M) AF JALAHALLI
₹18,400
12 Sept 2026
28 Jul 2026
1 Sept 2026
28 Jul 2026
25 Aug 2026
11 Aug 2026
28 Jul 2026 - 3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and planting of baffalo grass by dibbling root method complete or all as specified below and directed :-
(a) Level the complete area and excavate the area not less than 60 cm deep in any type of soil.(b) Remove unwanted waste materials like metals, deberies, stones, plastic waste, weed, etc.(c) A mixture of red earth and farm yard manure in the proportion of 2 :1 should be filled in the excavated area.
(d) Watering the area after final dressing of soil after one week continuously till the soil get watered/wet upto 10 to 15 cm deep and eradication of weeds/vegetation etc if any (e) Final dressing of top of surface of soil to required slope and gradient towards the manholes(f) Plantation of grass at the rate of 10 cm c/c both ways by dibbing root method.(g) Remove excavated earth from site & deposited at the area directed upto a distance not exceeding 100 mtr.(h) Approved Insecticides & fungicides should be sprayed over the processed area.
Notes :- Defect Liability Period of Arboriculture is two years and maintenance of plants shall also be done by Contractor during this Peiod. The rates quoted by the contractor shall be deemed to include the cost of all above activities, materials and labour. nothing etc will be admissable on this account. | 1,900 | SQM | 16 | ₹30,400 |
| 2 | Material & Labour for 40 mm bore gun metal gate valve ISI marked with iron wheel screwed both ends for Iron pipe, complete all as specified and directed. | 6 | EACH | 16 | ₹96 |
| 3 | Material & Labour for 25 mm bore gun metal gate valve ISI marked with iron wheel head, screwed both ends for iron pipe, complete all as specified and directed. | 15 | EACH | 16 | ₹240 |
| 4 | Material & Labour for 25 mm bore steel tubes “medium grade” galvanised with all fitting and fixed in walls ceiling or laid in floors, complete all as specified and directed. | 310 | RM | 16 | ₹4,960 |
| 5 | Material & Labour for 40mm bore steel tubes “medium grade” galvanised with all fitting and fixed in walls or laid in floors, complete all as specified and directed. | 65 | RM | 16 | ₹1,040 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_875111.xls
BOQ • 0.25 MB
85378TENDER.pdf
Tender Documents • 1.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .