Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC | ₹3.3 Cr Quoted ₹3.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 CrRejected-AOC | ₹3.7 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | BRConstructions L1 | SRI M.S & CO L2 |
|---|---|---|---|---|---|
| 1.00CIVIL WORKS (Part-A) | |||||
| 1.01 | Dismantling of RCC by manual / by using deploying machineries etc., complete complying with standard specification and as directed by SIPCOT Officers. | 25 | cum | 4,827.2 ₹1.2 L | 4,956.5 ₹1.2 L |
| 1.02 | Dismantling of Pressed tiles and weathering course etc., complete complying with standard specification and as directed by SIPCOT Officers. | 1,000 | sqm | 51.52 ₹51,520 | 52.9 ₹52,900 |
| 1.03Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the SIPCOT officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by SIPCOT Officers. | |||||
| 1.04 | 0-2m depth | 178 | cum | 246.4 ₹43,859.20 | 253 ₹45,034 |
| 1.05 | Supplying and filling in foundation, basement, etc with filling M. sand in layers of not more than 15 cm thick well watered, consolidation etc., complete complying with standard specification and as directed by SIPCOT Officers. | 45 | cum | 2,016 ₹90,720 | 2,070 ₹93,150 |
| 1.06 | Plain Cement concrete 1:4:8 (one cement, five sand and ten aggregate) using 20mm metal for foundation and flooring using hard broken granite stone jelly including dewatering, shoring, strutting wherever necessary and curing etc., complete complying with standard specification and as directed by SIPCOT Officers. | 45 | cum | 6,535.2 ₹2.9 L | 6,710.25 ₹3.0 L |
| 1.07 | Supplying and filling of gravel by lorry in basement filling including conveyance loading and unloading charges and all other incidential charges filling laying watering and consolidation etc., complete as directed by the SIPCOT, Officers with standard specification. | 40 | cum | 543.2 ₹21,728 | 557.75 ₹22,310 |
| 1.08Reinforced Cement Concrete M 35 Design Mix using ordinary portland cement with water cement ratio not exceeding 0.45 including plasticizer etc for RCC works in super structure 20mm gauge down graded hard broken stone jelly excluding the cost and fabrication of reinforcement grills, shuttering and centering but including vibrating, laying, curing, finishing etc., complete as directed by the SIPCOT Officers with standard specification. | |||||
| 1.09 | Foundation and basement | 82 | cum | 10,295.04 ₹8.4 L | 10,570.8 ₹8.7 L |
Tender Value
₹3.2 Cr
EMD Value
₹1.7 L
Closing Date
1 Aug 2025, 3:00 pmClosed
SUPERINTENDING ENGINEER
SIPCOT Head office egmore chennai
Construction of work shop and Construction of First floor over the existing ITI Building at SIPCOT Industrial Park, Oragadam
2025_SIPCT_580973_1
NIT.No.10/CD/T.No.10/2025-26
Open Tender
Civil Works
SIPCOT Industrial Park, Oragadam
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹1.7 L
SIPCOT HEAD OFFICE
26 Feb 2026
12 Jul 2025
1 Aug 2025
12 Jul 2025
1 Aug 2025
12 Jul 2025
16 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid