Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 17 KALI CHARAN DUTTA ROAD BEHALA KOLKATA 700061 | KOLKATA | WEST BENGAL | 700061 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.9 L+₹1,797.86 (0.37%)Rejected-AOC RAMPUR HAZRA LANE BANKURA W B | BANKURA | BANKURA | WEST BENGAL | L2 | Rejected-AOC Rejected. | |
| 3 | L3₹4.9 L+₹1,989.03 (0.41%)Rejected-Finance 334 1 SCHOOLDANGA BANKURA 722101 | BANKURA | WEST BENGAL | 722101 | L3 | Rejected-Finance Rejected | |
| 4 | L4₹5.0 L+₹8,312.44 (1.70%)Rejected-Finance INDARAGORA BANKURA W B | BANKURA | BANKURA | WEST BENGAL | L4 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹17,100
Closing Date
15 Jan 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Bankura Mech Divn, PHE Dte
Office of the Executive Engineer. Bankura Mechanical Division. P.H.E. Dte. Ailakundi, PO Kenduadihi, Bankura 722102.
Supply and installation of Dual use AC Submersible Solar Motor Pump Set in ground bore well along with 1200 watts peak solar photovoltaic array including other related works at Kantabagan Kundu Para, GP Deshra Koalpara , Kotulpur, Dist-Bankura
2020_PHED_308177_8
WBPHED/EE/BMD/NIeT- 04 OF 2020-2021
Open Tender
MECHANICAL
Item Rate
45 days
Bankura
Please refer Tender documents.
6 documents required · 6 mandatory
₹17,100
5 Feb 2021
15 Dec 2020
19 Jan 2021
15 Dec 2020
15 Jan 2021
15 Dec 2020
180 days
Amount
Supply delivery storage and installation of submersibel solar SS pump 110VAC capacity of 2500 LPH from a total dynamic head of 50M and rating of 1HP (Max) together with suitable inverter including all pipes, specials float assembly, cables required for installation of the above pump with 5 years Annual Maintenance Contract and as per technical specification given in NIeT along with at least but not limited to the underlaid protections: - • Protection against dry operation of pump motor set • Protection against Lightning, hails and storm • Full protection against open circuit, accidental short circuit and reverse polarity. (Manufacturer's test certificate from any one of the MNRE accredited lab regarding performance of the solar pump system is mendatory)
Supply delivery assembly erection and commissioning of Solar PV array with MPPT of minimum capacity 1200WP measured at STC with sufficient number of Modules in series and parallel as per design (With minium 74WP power output of individual PV module in the PV array under STC) ensuring indeginiously produced PV modules containing mono / poly crystallation silicon solar cells with IEC 61215 certification and safety qualifications standard as per Class 3, Class A of IEC 61730 Part I & II and with relevant specification and warranty condition as per MNRE guidlines latest ammendments and as per Specification laid in the NIeT
Withdrawal of existing IM – II hand pump set & reinstallation of the same after lowering of AC submersible pump of Item No 1 including repairing of the existing IM – II hand pump assembly by supplying and fitting the required new spares of approved make and quality
Making wire net fencing around the solar panel platform by supplying, fitting, fixing of galvanized MS angle of approved quality which will be grouted on Earth by cement concrete as per drawing including an arrangement for a gate with lock and key facility which will have to be provided as per direction of E. I. C.
Erection of MS structure of adequate strength and appropiate design, which can withsatand load of modules and high wind velocity upto 150KMPH (The support structure used in pumping system should be hot dip galvanised iron with minimum 120micron thickness).The structure should be modified for performance enhancement of the SPV, Manual, Passive or auto tracking system should be used. For manual tracking, arrangement for seasonal tilt angle adjustment and three times manual tracking should be provided As per Specification laid in the NIeT
Making distribution system with 40mm Ф uPVC make Supreme / Oriplast / Longlast
Making distribution system with 32mm Ф uPVC make Supreme / Oriplast / Longlast
Making distribution system with 25mm Ф uPVC make Supreme / Oriplast / Longlast
Making distribution system with 15mm Ф uPVC make Supreme / Oriplast / Longlast
Supply delivery, fitting and fixing of special GI fabricated water chamber as per specification over and above the third plate of the hand pump as per drawing including all fitting materials as per direction of E. I. C.
Construction of R.C.C street stand post with platform and 1.00 mtr masonry drain etc with ordinary cement concrete M-15 (mix 4:2:1) with 20mm down local hard stone (crusher broken) including plastering 20mm (6:1) with neat cementing to platform & drain as per dept type & drain as per dept type drawing and design including tapping the distribution main, supplying, fitting fixing 15mm brass ferule with necessary saddle piece with 20mm Ф G.I Pipes of approved make with specials and nipple, bib cock, reducing socket etc. all complete as per direction of E.I.C
Construction of masonry drain attached to platform of RCC Street stand post with 12.5 cm thick brick work in cement mortar (1:4) over a layer of single brick flat soling with sand filling 150mm thick with WCC (6:3:1) with picket pieces (30mm size) including excavation of Earth, 15mm thick cement plaster (4:1) with neat cement punning all complete chamfering the edges as per drawing and direction of E. I. C.
Supply delivery storage and insallation of PVC tank with food grade inside lining of capacity 5KL
Making double Earthing Arrangement for the above Pumping machinery and other electrical Accessories
Extra carriage charges for transportation of all materials related to the above work at working site by manual labour time to time by head load due to inaccessibility of site if required, with prior permission.
Add: 12% GST
Add: 1% Cess
ABHIJIT MUKHERJEE
TAPAN KUMAR SARKAR
M/S NABIN GOPAL SENGUPTA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .