Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.2 CrAccepted-AOC AT WARD NO 06 PO PS BARIPADA DIST MAYURBHANJ ODISHA 757001 | BARIPADA | MAYURBHANJ | ODISHA | 757001 | ₹98.2 Cr Quoted ₹98.2 L | L1 | Accepted-AOC Winner through opening of the Financial Bid (Cover-II) |
| 2 | L2₹99.5 L+₹1.2 L (1.24%)Rejected-Finance | ₹99.5 L+₹1.2 L (1.24%) | L2 | Rejected-Finance Loss through opening of the Financial Bid (Cover-II) |
| 3 | L3₹1.2 Cr+₹24.4 L (24.9%)Rejected-Finance AT WARD NO 06 PO PS UDALA DIST MAYURBHANJ ODISHA 757041 | UDALA | MAYURBHANJ | ODISHA | 757041 | ₹1.2 Cr+₹24.4 L (24.9%) | L3 | Rejected-Finance Loss through opening of the Financial Bid (Cover-II) |
| 4 | Rejected-Technical AT SALAGADIA PO MAJHIGADIA VIA PS KAPTIPADA DIST MAYURBHANJ | - | - | Rejected-Technical As per DTCN |
| 5 | Rejected-Technical NEAR KIIT CAMPUS WARD NO 01 PO KIIT PS INFOSITY BHUBANESWAR PIN 751024 | BHUBANESWAR | KHORDHA | ODISHA | 751024 | - | - | Rejected-Technical As per DTCN |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
5 Feb 2026, 5:00 pmClosed
CCE, Eastern (R and B) Circle, Balasore
O/o CCE, Eastern (R and B) Circle, Balasore
Building Work
2026_EICCL_124989_6
CCEEC-16/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Mayurbhanj
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹1.2 L
Yes
5 Jun 2026
22 Jan 2026
6 Feb 2026
22 Jan 2026
5 Feb 2026
22 Jan 2026
22 Jan 2026 - 31 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL PORTION OF WORK : - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 319 | Sqm | 8.4 | ₹2,679.6 |
| 2 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | 183.84 | Cum | 276.89 | ₹50,903.46 |
| 2.01 | Paver block | 67.5 | Cum | 276.89 | ₹18,690.08 |
| 3 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | 333.6 | Cum | 762.9 | ₹2,54,503.44 |
| 3.01 | Paver block | 22.5 | Cum | 762.9 | ₹17,165.25 |
| 4 | Filling area with excavated earth materials including labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charge. | 61.3 | Cum | 153.8 | ₹9,427.94 |
| 5 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, taxes of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge. | 48.96 | Cum | 6,975.89 | ₹3,41,539.57 |
| 6Cement concrete of proportion (1:2:4) in foundation and floors using 12nm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge. | |||||
| 6.01 | Ground Floor | 5.37 | Cum | 8,591.65 | ₹46,137.16 |
| 6.02 | Mumty Floor | 0.4 | Cum | 9,028.49 | ₹3,611.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.77 MB
DTCN1.pdf
Tender Documents • 1.75 MB
BOQ_577512.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .