| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC Accept |
| 2 | L2₹5.1 LRejected-Finance | ₹5.1 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Ayyanar L2 | Vignesh E L1 |
|---|---|---|---|---|---|
| 1.00Repairs to 3 class room School Building (RCC Roof) at Panchayat union Middle school in Thurinjipattu Panchayat | |||||
| 1.01 | Dismantling the existing damaged Pressed tiles etc.. | 161.45 | cum | 40.37 ₹6,517.74 | 40.37 ₹6,517.74 |
| 1.02 | Finishing top roof mix one course machine pressed tiles of size 20 cm x 20 cm x 2 cm approved qty with,CM.1:3 12 mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same mortar etc (40%new-60%Old) | 161.45 | cum | 1,448.94 ₹2.3 L | 1,448.94 ₹2.3 L |
| 1.03 | White washing one coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm | 161.45 | cum | 36.87 ₹5,952.66 | 36.87 ₹5,952.66 |
| 1.04 | Distembering one coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site including all cost & labour etc., complete with standard specifications. | 338.96 | cum | 80 ₹27,116.80 | 50 ₹16,948 |
| 1.05 | Re Painting two coat with ready mixed emulsion paint over old wall surface including all cost and labour etc., complete with standard specification. | 171.26 | nos | 280 ₹47,952.80 | 240 ₹41,102.40 |
| 1.06 | Painting one coat with approved quality of enamal paint over the old iron work including all cost and labour etc., complete with standard specification. | 63.38 | nos | 86.68 ₹5,493.78 | 86.68 ₹5,493.78 |
| 1.07 | Painting one coat with ready mixedblack board paint including all cost and labour etc., complete with standard specification. | 12.48 | nos | 87.92 ₹1,097.24 | 87.92 ₹1,097.24 |
| 1.08 | Towards the Cost of materials and Bala Painting charges | 1 | nos | 1,00,000 ₹1 L | 1,00,000 ₹1 L |
| 1.09 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 77,051 ₹77,051 | 73,988 ₹73,988 |
Tender Value
₹5.0 L
EMD Value
₹4,980
Closing Date
26 Jun 2025, 4:00 pmClosed
BDO THIRUKOILUR
BDO THIRUKOILUR
Repairs to 3 class room School Building (RCC Roof) at Panchayat union Middle school in Thurinjipattu Panchayat
2025_RDTN_570278_1
TNKKI/TRK/ SIUS / 2025-26/02
Open Tender
Civil Works
90 days
THIRUKOILUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,980
Yes
22 Jan 2026
18 Jun 2025
26 Jun 2025
18 Jun 2025
26 Jun 2025
18 Jun 2025
Amount
Repairs to 3 class room School Building (RCC Roof) at Panchayat union Middle school in Thurinjipattu Panchayat
Dismantling the existing damaged Pressed tiles etc..
Finishing top roof mix one course machine pressed tiles of size 20 cm x 20 cm x 2 cm approved qty with,CM.1:3 12 mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same mortar etc (40%new-60%Old)
White washing one coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Distembering one coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site including all cost & labour etc., complete with standard specifications.
Re Painting two coat with ready mixed emulsion paint over old wall surface including all cost and labour etc., complete with standard specification.
Painting one coat with approved quality of enamal paint over the old iron work including all cost and labour etc., complete with standard specification.
Painting one coat with ready mixedblack board paint including all cost and labour etc., complete with standard specification.
Towards the Cost of materials and Bala Painting charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Ayyanar (BID ID -1381808)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid