Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance 1876 3 RAJEEV NAGAR STREET NO 8 GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | -4.50% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 L+₹4,326.11 (2.27%)Admitted-Finance BHIWANI HARYANA | BHIWANI | HARYANA | 127021 | -2.33% | ₹1.9 L+₹4,326.11 (2.27%) | L2 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
22 Aug 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
ANNUAL MTC. ESTIMATE OF INTERNAL WATER SUPPLY SCHEME FOR SECTOR-5,6P-I, 6P-II, MT and AUTO MARKET INCLUDING HBC HANSI (2026-27)
2026_HBC_541249_1
2026A5152B0E F1FB 4B20 BBD6 06A696E010B4259HSV
Open Tender
Civil Works
Works
90 days
Hansi
Dismantling of RCC Clear water tank including earth filling and compaction at Boosting station in Sector-6P, Hansi and all other work contingent thereto
2 documents required · 2 mandatory
₹250
Yes
₹4,000
Yes
24 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
22 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications | 262.88 | Sqm | 7 | ₹1,840.16 |
| 2 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. | 880.67 | cum | 184 | ₹1,62,043.28 |
| 3 | [5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) | 73.91 | cum | 480 | ₹35,476.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_620636.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .