| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.8 LAccepted-AOC 270 17TH WARD KARUMALAIKOODAL METTUR DAM 2 | METTUR DAM | ₹4.8 L Quoted ₹4.3 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | PRANAV ENGINEERING L1 |
|---|---|---|---|---|
| 1.00 | Overhauling of Degassed Water Transfer Pumps / DM Water Transfer Pumps / Stator Water Transfer Pumps / Boiler Fill Pumps / Hot Well Makeup Pumps / Acid and Alkali unloading pumps
Charges for de-coupling the pump & its motor after disconnecting the Electric supply, de-positioning the Motor, Remove the Rotary assembly from casing and refitting the same after completion of overhauling works. | 12 | No. | 5,370 ₹64,440 |
| 2.00 | Charges for dismantling the pump spares & renewal of worn-out parts by new one or reconditioning the spares if necessary and reassembling the same and other related work if any. | 12 | No. | 10,750 ₹1.3 L |
| 3.00 | Charges for removing the existing wear rings from impeller and refixing new rings, machining to required dimension, drilling & tapping works for crub screw arrangement. | 12 | No. | 1,890 ₹22,680 |
| 4.00 | Charges for pump and motor alignment work | 12 | No. | 6,740 ₹80,880 |
| 5.00 | Single Stage Effluent water transfer pumps
Charges for complete overhauling including dismantling, cleaning of Effluent pump parts, replacing the worn out spares by new one (if necessary) and re - assembling the same after completion of overhauling work & allied works if any. | 2 | No. | 41,850 ₹83,700 |
| 6.00 | Charges for Trueness checking & removing run out for the Head & Impeller Shaft of Effluent Pump. | 2 | No. | 2,500 ₹5,000 |
| 7.00 | Charges for alignment for the base plate of the vertical Effluent pump with bed frame Bed bolts in full tight condition and coupling the motor with the pump & related works. | 2 | No. | 10,750 ₹21,500 |
| 8.00 | Supply of bearings for Hot well makeup pumps & Boiler fill pumps | 12 | set | 1,500 ₹18,000 |
| 9.00 | Supply of bearings for Effluent pump | 2 | No. | 1,050 ₹2,100 |
| 10.00 | T & Ps and consumables | 1 | LS | 4,200 ₹4,200 |
Tender Value
Refer Docs
EMD Value
₹3,400
Closing Date
5 May 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM DM Plant Overhauling of Boiler Fill Pumps Hot well make up Pumps Effluent Water Transfer Pumps Degassed Water Transfer Pumps DM Water Transfer Pumps Stator Water Pumps Acid and Alkali unloading pumps in DM Plant Stage I and II and CST
2025_EB_549153_1
CE / MTPS-I / SE / M-I / BM /OT.38 / 2025-26
Open Tender
Power/Energy Projects/Products
10 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹3,400
Yes
26 May 2026
21 Apr 2025
6 May 2025
21 Apr 2025
5 May 2025
21 Apr 2025
Amount
Overhauling of Degassed Water Transfer Pumps / DM Water Transfer Pumps / Stator Water Transfer Pumps / Boiler Fill Pumps / Hot Well Makeup Pumps / Acid and Alkali unloading pumps Charges for de-coupling the pump & its motor after disconnecting the Electric supply, de-positioning the Motor, Remove the Rotary assembly from casing and refitting the same after completion of overhauling works.
Charges for dismantling the pump spares & renewal of worn-out parts by new one or reconditioning the spares if necessary and reassembling the same and other related work if any.
Charges for removing the existing wear rings from impeller and refixing new rings, machining to required dimension, drilling & tapping works for crub screw arrangement.
Charges for pump and motor alignment work
Single Stage Effluent water transfer pumps Charges for complete overhauling including dismantling, cleaning of Effluent pump parts, replacing the worn out spares by new one (if necessary) and re - assembling the same after completion of overhauling work & allied works if any.
Charges for Trueness checking & removing run out for the Head & Impeller Shaft of Effluent Pump.
Charges for alignment for the base plate of the vertical Effluent pump with bed frame Bed bolts in full tight condition and coupling the motor with the pump & related works.
Supply of bearings for Hot well makeup pumps & Boiler fill pumps
Supply of bearings for Effluent pump
T & Ps and consumables
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid