| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC NEAR GOVT GIRLS SCHOOL VILLAGE DINOD TEHSIL AND DISTRICT BHIWANI 127111 | BHIWANI | BHIWANI | HARYANA | 127111 | L1 | Accepted-AOC single bidder |
Tender Value
₹2.5 L
EMD Value
₹5,100
Closing Date
17 Mar 2022, 3:30 pmClosed
Executive Engineer, Bhiwani W/S Division Bhiwani
Canal Colony Bhiwani
Re- Construction of water course crossing at RD- 162200 of B.G Drain
2022_HRY_212073_12
419-440/9A dt 24.02.2022
Open Tender
Chemicals/Minerals
Works
30 days
Bhiwani W/S Division Bhiwani
Please refer tender document
2 documents required · 2 mandatory
₹500
₹5,100
Yes
7 Jul 2022
11 Mar 2022
22 Mar 2022
11 Mar 2022
17 Mar 2022
11 Mar 2022
Amount
Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil. HSR 4.12
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size(HSR 6.1.4)
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in : Cement mortar 1:3 (1 cement : 3 coarse sand) (HSR 7.20.1)+(7.3)-(7.4)
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers (HSR 6.30.5)
Centering and shuttering including strutting, propping etc, and removal of form work for : Columns, piers, abutments, pillers, posts and struts (HSR 6.29.3)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. (HSR 6.33.6)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :-1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) (6.14.1)
Pointing on brick work or brick flloring with cement mortar 1:3 (1 cement : 3 fine sand) raised and cutting pointing (HSR item No. 11.25.2)
Smooth finishing of the exposed surface of RCC work with 10mm thick C.M 1:3 (1 cement : 3 fine sand) HSR item no. 11.50
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .