Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 13 138 SHAKTINAGAR SHUKLAGANJ UNNAO | UNNAO | UTTAR PRADESH | 209801 | Admitted-Finance |
| 2 | Admitted-Finance B 383 KANCHIRAM NAGAR MORADABAD | Admitted-Finance |
| 3 | Admitted-Finance 0 0 RAMNAGAR FATEHPUR ROAD KADIRABAD GRAM BUDHWAL PARGANA AND TEHSIL RAMNAGAR BARABANKI UTTAR PRADESH 225202 | BARABANKI | UTTAR PRADESH | 225202 | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical PART A NOT COMPELTED |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
12 May 2020, 2:30 pmClosed
SE EDC II
33/11 KV S/s FATEHABAD
For the work of reconstruction of 11/33 Kv line fallen due to Deviya Appda and other
2020_DVVNL_467214_1
02/EDC-II/Ft-II/2020-21
Open Tender
Miscellaneous Works
Lump-sum
180 days
BAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹5,000
Yes
14 May 2020
7 May 2020
12 May 2020
7 May 2020
12 May 2020
7 May 2020
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) a) 8.5 Mtr. long PCC Poles.
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) a) 9 Mtr. long PCC Poles.
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) a) 9/11 Mtr. ST Poles.
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any.
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.) a) 8.5 Mtr. long PCC Poles.
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)B) 9 Mtr. Long PCC Poles
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)C) 9/11 Mtr. ST Poles.
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)D) 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any.
Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
Replacement of damaged poles of LT Lines by digging of pits and dismantling of all 11KV/LT accessories from the existing / damaged pole and erection of single new pole including fitting all accessories.
Replacement of damaged poles HT Lines by digging of pits and dismantling of all 11KV/33 KV accessories from the existing / damaged pole and erection & grouting of single new pole including fitting of all accessories.
Replacement of damaged poles 33 KV Lines by digging of pits and dismantling of all 11KV/33 KV accessories from the existing / damaged pole and erection & grouting of single new pole including fitting of all accessories.
Recostructions of damaged Double pole (Saction) on 11 KV Lines by dismantling of T/f, opening of all accessories of LT S/S then removing damaged poles by digging earth pit(s), erecting new poles then fixing of of LT S/S accessories such as Dropper channel, T/F base, Disc Insulators with fitting and other 11 KV accessories etc., required for proper completion of work.
Replacement of damaged Double pole structure on 33 KV Lines dismantling of T/f, opening of all accessories of LT S/S then removing damaged poles by digging earth pit(s), erecting new poles then fixing of of LT S/S accessories such as Dropper channel, T/F base, Disc Insulators with fitting and other 11/33 KV accessories etc., required for proper completion of work.
Erection and grouting of stays in 1:4:8 ratio cement, sand and stone ballst, its tightning, binding, nozelling etc. of stay wire with stay and stay clamp of pole as per requirement of work at site.
Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer.
Re- sagging and stringing of existing conductor in 11KV/ /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.
Re- sagging and stringing of existing conductor in 33 KV Lines line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.
Replacement of damaged following 11 KV accessories along with Nut & Bolt and all other related accesoories :- A) 11 KV X-Arm
B) 11 KV Disc Insulator with fitting
C) 11 KV Pin insulator with pin
D) F" Clamp/X-Arm Clamp/D.P.Clamp/L.T. Pin Clamp
E) L.T. insulator
Straightening of tilted single 8.5 Mtr. PCC Polesof existing lines by opening of line conductor, digging earth pit, straightning of pole, filling the earth pit after straightning then relaying the line conductor, as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Straightening of tilted single 9/11 Mtr. ST Poles/R.S. Joyst in the existing lines by opening of line conductor, digging earth pit, straightning of pole, filling the earth pit after straightning then relaying the line conductor, as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Guarding / Re-Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
Numbering of poles by suitable paint. Paint & Concerning material shall be provided by the contractor at his own cost.
Vediography of All Poles Shall be made by the contractor of concerning site before starting the work and after the completion of work & the copy of vediography shall be submitted by the contractor at the time of Measuremnt/Payment.
Removal of Damaged/Burned LT Distribution Boxes & Fixing a new already/Newly erected pole for giving supply to consumer by connecting consumer by connecting consumer cable by using appropriated aluminium lug tape N& B Provided By Contractor as per requirment.
Shiva Enterprises
r s enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .