Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.1 LAdmitted-Finance 3 GHA 10 VIGYAN NAGAR KOTA | KOTA | KOTA | RAJASTHAN | L1 | Admitted-Finance | |
| 2 | L2₹1.0 Cr+₹12.1 L (13.3%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical PANCHWATI NAGAR KUNHARI KOTA RAJ | KOTA | KOTA | RAJASTHAN | - | Rejected-Technical Bidder not Fulfill PQR |
| Sl No | Description | Qty | Unit | UNIVERSAL ENGINEERS L1 | DEEPAK ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00PART-B | |||||
| 1.10Routine, preventive and breakdown maintenance of pumps and other equipments installed at Water Treatment Plant, cooling water System, Cooling Tower and associated system by providing manpower as under in general shift. | |||||
| 1.11 | Skilled Manpower | 4 | Per Day/Labour | 283 ₹5,37,951.6 | 283 ₹5,16,825.4 Lowest |
| 1.12 | Semi-Skilled Manpower | 7 | Per Day/Labour | 271 ₹9,01,506.2 | 271 ₹8,68,802.2 Lowest |
| 1.13 | UnSkilled Manpower | 9 | Per Day/Labour | 259 ₹11,07,734.85 | 259 ₹10,71,205.65 Lowest |
| 1.20Providing daily assistance in operation and minor maintenance work of different equipments installed at water treatment Plant, cooling water system, cooling tower and associated system by providing manpower as under round the clock in shift duties. | |||||
| 1.21 | Skilled Manpower | 12 | Per Day/Labour | 283 ₹16,13,854.8 | 283 ₹15,50,476.2 Lowest |
| 1.22 | Semi-Skilled Manpower | 12 | Per Day/Labour | 271 ₹15,45,439.2 | 271 ₹14,89,375.2 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
27 Feb 2023, 11:00 amClosed
SE CA KaTPP RVUNL Jhalawar
Second floor room no. 204 service building KaTPP RVUNL Jhalawar
Annual work contract of routine, preventive and breakdown maintenance work of water treatment plant, cooling water system, natural draft cooling tower and associated system of Unit 1and 2 (2x600 MW), KaTPP, RVUNL, Jhalawar
2023_RRVUN_316343_1
TN/CA/511/2022-23
Open Tender
Miscellaneous Works
Percentage
365 days
Kalisindh Thermal Power Project Jhalawar
As per enclosed with tender documents
3 documents required · 3 mandatory
₹5,900
Assistant Account Officer KaTPP RVUNL Jhalawar
₹2.2 L
4 May 2023
27 Jan 2023
28 Feb 2023
27 Jan 2023
27 Feb 2023
27 Jan 2023
PART-B
Routine, preventive and breakdown maintenance of pumps and other equipments installed at Water Treatment Plant, cooling water System, Cooling Tower and associated system by providing manpower as under in general shift.
Skilled Manpower
Semi-Skilled Manpower
UnSkilled Manpower
Providing daily assistance in operation and minor maintenance work of different equipments installed at water treatment Plant, cooling water system, cooling tower and associated system by providing manpower as under round the clock in shift duties.
Skilled Manpower
Semi-Skilled Manpower
Bidder Name
Amount
UNIVERSAL ENGINEERS(GSTN-08AGYPG1844L1ZS)
DEEPAK ELECTRICALS(GSTN-08AFHPA2477B1ZV)
UNIVERSAL ENGINEERS
DEEPAK ELECTRICALS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
Tenderdocument.pdf
Tender Documents • 22.22 MB
BOQ_560093.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .