| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹5,000
Closing Date
7 Sept 2020, 6:00 pmClosed
SE EUDC ALIGARH
ALIGARH
ELECTRIFICATION WORK AGAINST SANCTIONED PACKAGES UNDER EUDD-4 ALIGARH
2020_DVVNL_507535_1
EUDCA-81/2020-21
Open Tender
Electrical Works
Item Rate
45 days
EUDD-4 ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
DVVNL AGRA
₹5,000
14 Sept 2020
2 Sept 2020
8 Sept 2020
2 Sept 2020
7 Sept 2020
2 Sept 2020
Amount
Safe carriage of following S.T Poles/ PCC Poles from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the repective ends.
11 Mtrs. long S.T.Pole
Safe carriage of line material viz. Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps & other material from store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends.
Erection of following single support including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work.
11 Mtrs. long S.T.Pole
Grouting of single support as per RESSPO Manual including of the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
11 Mtrs. long S.T.Pole
Erection & grouting of 11 Mtrs. ST double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
Laying sagging stringing and binding of ACSR Weasel Conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.
Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.
Safe carriage of 100 KVA Distribution Transformer from Electricity Store Centre, Sarsol/Workshop, Jalapur or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on double pole / placement on the Plinth including proper jumpering from 11 KV TPMO to the transformer and also connecting the LT site cables as per RESSPO Manual.
Safe carriage of 25 KVA Distribution Transformer from Electricity Store Centre, Sarsol/Workshop, Jalapur or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on double pole / placement on the Plinth including proper jumpering from 11 KV TPMO to the transformer and also connecting the LT site cables as per RESSPO Manual.
Fabrication of T-Off Channel as per RESSPO Norms.
Fabrication of Top Channel as per RESSPO Norms.
Fabrication of Dropper Channel as per RESSPO Norms.
Fabrication of T/F Base Channel/Angle as per RESSPO Norms.
Neutral & body earthing of Distribution Transformer by digging of pit upto water level depth (approx. 125 feet) and then inserting 1-¼” dia GI pipe of ‘A’ grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms.
Safe carriage of 11kV XLPE HT Cable from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends.
Laying of 11kV XLPE HT Cable including making proper connections with Transformer LT side and LT line. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
Safe carriage of 3.5x120Sq.mm. LT Cable from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends.
Laying of 3.5x120Sq.mm. LT Cable including making proper connections with Transformer LT side. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
Filling of 11 KV I/D & O/D cable Jointing Kit as per RESSPO Norms.
K.D. (INDIA)
P K ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .