Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAdmitted-Finance | ₹27.5 L | L1 | Admitted-Finance |
| 2 | L2₹29.3 LAdmitted-Finance | ₹29.3 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Arun Raj L2 | S Kuppusamy L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 388.35 | Cum | 263 ₹1.0 L | 220 ₹85,437 |
| 2.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 51.78 | Cum | 5,400 ₹2.8 L | 4,800 ₹2.5 L |
| 3.00 | Supplying and Erecting Centering with steel shutters and supports including cost and conveyance and all other labour charges,etc.complete. | 1,122.66 | sq.m | 550 ₹6.2 L | 510 ₹5.7 L |
| 4.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 169.65 | Cum | 6,400 ₹10.9 L | 6,000 ₹10.2 L |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.7 | MT | 91,000 ₹63,700 | 80,000 ₹56,000 |
| 6.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 6.3 | Cum | 9,300 ₹58,590 | 8,000 ₹50,400 |
| 7.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 220.2 | sq.m | 584 ₹1.3 L | 520 ₹1.1 L |
| 8.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 76.52 | Cum | 263 ₹20,124.76 | 200 ₹15,304 |
| 9.00 | Filling the Soak Pit With 225 mm Boulders as per Specification | 8.27 | Cum | 841 ₹6,955.07 | 2,800 ₹23,156 |
| 10.00 | Filling the Soak Pit with 40mm Metal as per Specification | 19.17 | Cum | 1,755 ₹33,643.35 | 3,000 ₹57,510 |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
23 Dec 2025, 3:00 pmClosed
Block Development Officer
Trupur Union office Tiruppur
NNT - 2025 - 26 Pkg 01 Construction of Drainage With 2 Nos of RCC Culvert and Vertical Soak pit from Chakra nagar to Muttiyankinaru Via Kovai Main road - Muttiyankinaru H/o Ettiveerampalayam
2025_RDTN_633831_1
1021/2025/A2 date 23.12.2025
Open Tender
Civil Works - Others
180 days
Ettiveerampalayam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹30,000
Yes
5 Jan 2026
18 Dec 2025
23 Dec 2025
18 Dec 2025
23 Dec 2025
18 Dec 2025
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Erecting Centering with steel shutters and supports including cost and conveyance and all other labour charges,etc.complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Filling the Soak Pit With 225 mm Boulders as per Specification
Filling the Soak Pit with 40mm Metal as per Specification
Filling the Soak Pit 20mm metal as per Specification
Supplying laying and jointing PVC pipe above ground level (External) 65mm dia
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Precast concrete block masonry (including Quoin Blocks, Jamb blocks, closers, etc) with Solid cement concrete blocks of approved size size made of cement concrete 1:3:6 mix ( 1 cement, 3 coarse M.Sand, 6 graded stone aggregate 20mm and down gauge) in foundation and plinth in cement lime mortar 1:2:9 (1 cement, 2 lime putty 9 coarse M.Sand)/ 1:1:6 (1 cement, 1 lime putty, 6 coarse M.Sand )/ Cement 1:6 (1 cement: 6 coarse M.Sand) Details of cost for 1.89cum of precast concrete blocks masonry.) 100 sqft x 2/3 = 66 2/3 cft= 1.89cum) (No. 7.75)
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc
Cost and Supply of 300mm RCC Hume pipe including all Charges etc.,Completed
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
price1.pdf
Additional Documents • 0.54 MB
TechnicalBid1.pdf
Tender Documents • 0.31 MB
BOQ_758375.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid