Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹38.8 LAccepted-AOC MISTRY PATTY LUMDING P O LUMDING P S LUMDING DIST NAGAON ASSAM PIN 782447 | HOJAI | ASSAM | 782447 | 1 | Accepted-AOC Animesh Mishra found as a lowest bidder | |
| 2 | 2₹38.8 L+₹500 (0.01%)Rejected-Finance CHANDA VILA KALIBARI PUKURPAR HOJAI LUMDING P O LUMDING P S LUMDING DIST NAGAON PIN 782447 ASSAM | HOJAI | ASSAM | 782447 | 2 | Rejected-Finance Higher Bid Quoted and lower marks obtained |
Tender Value
₹38.8 L
EMD Value
₹38,775
Closing Date
13 May 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer,Lumding MB
Executive Officer,Lumding MB,Atmaram Road,Hojai,Assam
Construction of Children Park at Santi Para
2025_UDD_44110_1
LMB.81/15th Fc(1st instl)/2020-21/NIT/2024-25/29 Dated - 11/04/2025
Open Tender
Civil Works - Others
Item Rate
Office Of The Lumding Municipal Board, Atmaram Road
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹38,775
Office Of The Lumding Municipal Board
31 Jul 2025
23 Apr 2025
14 May 2025
23 Apr 2025
13 May 2025
3 May 2025
30 Apr 2025
Amount
Part-A (Based on APWD Building Schedule 2013-14 with Escalation for DSR 2021)
20.12>Supplying and planting of ornamental trees (1'-0" height sapling) including pit making ( 60 cm x 60 cm x 60 cm ), filling the pit with appropriate soil media, manure and fertilizers as per specification and necessary maintenance for a period of one year..... SHADE TREE (F) Paine
Flowering Tree (A) Gulmohar / Ashok
For seatting benches.
For Water Fountain
Boundary Wall (Earth work)
1.1>Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling...... (A) Up to a depth of 2.00m below the existing ground level. (a) In ordinary soil
1.6>Supplying and filling sand gravel in foundation trenches of column footings over slushy soil including local carriage of materials within 8 km pumping out of water, ramming etc.............
1.7>Extra lead per km truck carriage for sand gravel beyond the initial lead of 8 km.
2.1.1>PLAIN CEMENT CONCRETE WORKS Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc.…. (a) In prop 1cement: 3 sand :6 coarse aggregate by volume
2.2.1>Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate.…. (I) Using Mixer Machine (A) In substructure up to plinth level Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works ............. N) Without using admixture, plasticiser b) M20 grade concrete or Prop. 1:1.5:3
2.2.1>Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate.…. (I) Using Mixer Machine (B) In super structure from plinth level up to 1st floor level. ii) Columns, pillars, posts, struts, suspended floor, roof, landing, shelf and support, balcony, lintel, sill band, beam, girder, bressumer, cantilever, staircase.... N) Without using admixture, plasticiser b) M20 grade concrete or Prop. 1:1.5:3
Form Work Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc.,
3.1.1.1>Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc..…. (a) Using 38mm thick plank
3.1.1.2>Sides of tie beams, grade beams etc. at or below ground level. (a) Using 38mm thick plank
3.1.1.3>Columns, Pillars, Posts & Strut (a) Square, Rectangular, polygonal in plan or any shape like Tee/L etc. having plane vertical face (i) Using 38mm thick plank
3.1.1.11>Arches/ slabs having curved surface in one direction. (Using 38mm thick plank)
Brick Work
4.1.1>Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level..... (a).Brick on flat soling.
4.1.8>1st class brick nogged wall in cement mortar including racking out joints and curing complete..... (A) 112mm thick brick wall (a) In cement mortar in proportion 1:4. (1 cement:4 sand)
Plastering
6.2.2>15 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level..... A) On rough side b) In cement mortar 1:4
6.2.2>15 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level..... B) On fair side b) In cement mortar 1:4
6.3.1>Pointing on brick work with cement mortar including curing complete as directed..... A) Cement mortar prop. 1:3 b) In cement mortar 1:4 c) Cut or weather struck pointing
Painting
13.9.1>SPECIAL WATHER PROOF COLOURING Finishing old / new wall with water proofing weather coat smooth anti-fungal exterior painting of approved make......
Reinforcement
18.1.1>Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending.....(No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL (i) TMT Corrosion resistant steel (CRS) reiforcement bar
Part-B (Based on DSR 2021) Pathways - Earthwork
2.6.1>Earth work in excavation by mechanical means(Hydraulic excavator)/manual means… All kinds of soil
2.38>Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%)..............
4.1.5>PLAIN CEMENT CONCRETE WORKS Providing and laying in position cement concrete of specified grade…. 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Brick Work
16.12>Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Main Gate (Earthwork)
2.6.1>Earth work in excavation by mechanical means(Hydraulic excavator)/manual means… All kinds of soil
2.38>Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%)..............
4.1.5>PLAIN CEMENT CONCRETE WORKS Providing and laying in position cement concrete of specified grade…. 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.2>REINFORCED CEMENT CONCRETE WORKS(UP TO PLINTH) Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement … 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
5.2.2>REINFORCED CEMENT CONCRETE WORKS(ABOVE PLINTH) Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc…… 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Form Work Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1>Foundations, footings, bases of columns, etc. for mass concrete
5.9.6>Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5>Lintels, beams, plinth beams, girders, bressumers and cantilevers
Reinforcement
5.22.6/ 5.22A6>Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding…….. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Brick Work
16.12>Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Flooring
11.41.2>Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved make..……. Size of Tile 600 x 600 mm
Plastering
13.2.1>CEMENT PLASTERING (In Fine Sand) 15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand)
13.31.2>POINTING Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): Raised and cut pointing
Painting
13.111.1>Finishing walls with Acrylic Smooth exterior paint of required shade :
Part-C (Based on Market Rate) Playing Equipment
GREEN CHILDREN FRP LOOP RUNG
MILD STEEL PLAYGROUND EQUIPMENTS GO ROUND 4 SEATER 5 FT DIA
TWO SEATER SEE SAW
OUTDOOR ARC PLAYGROUND DOME CLIMBER
RED SPIRAL OUTDOOR FRP PLAYGROUND SLIDE FOR GARDEN AGE 3-10
OUTDOOR DOUBLE SWING
STRAIGHT OUTDOOR FRP SLIDE, FOR PLAYGROUND, GARDEN AGE 12
OUTDOOR PLAYGROUND EQUIPMENT
FRP KIDS PLAYGROUND MULTIPLAY EQUIPMENTS
External Electrification
Supply, installation,testing and commissioning of 15W LED integrated type solar lighting system including PCC foundation, pole etc. complete(Onergy or equivalent make and as per approval of MNRE).
ARNAB BHATTACHARJEE (BID ID -268081)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .