| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical accepted |
| 2 | Accepted-Technical | Accepted-Technical accepted |
| 3 | Accepted-Technical | Accepted-Technical accepted |
| 4 | Accepted-Technical | Accepted-Technical accepted |
| 5 | Accepted-Technical | Accepted-Technical accepted |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
17 Aug 2026, 6:00 pmClosed
Executive Engineer Sgr Core
Office of the Executive Engineer Sgr Core
Restoration of Shrine of Hazrat Baba Naseeb ud din Gazi, Eidgah sangam
2026_PWDJK_319281_4
30 of RNB//Sgr-Core/2026-27
Open Tender
Civil Works
Percentage
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,600
Executive Engineer Sgr Core
₹2.2 L
21 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
17 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Restoration | |||||
| 1.01 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil : | 83.22 | cum | 592.9 | ₹49,341.14 |
| 1.02 | Providing and laying hand packed stone soling in foundation ,under floors etc. incl ramming, watering and consolidating complete ,cost and carriages of all materials involved upto site of work complete. | 30.27 | cum | 950 | ₹28,756.5 |
| 1.03 | Providing and laying in position cement concrete of specified grade M-10 including curing but excluding the cost of centering and shuttering - All work upto plinth level with 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 28.33 | cum | 5,202.9 | ₹1,47,398.16 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | 34.01 | cum | 7,788.4 | ₹2,64,883.48 |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works above plinth level 1:1.5:3 ( mix) | 14.17 | cum | 9,821.85 | ₹1,39,175.61 |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | 4,818 | kg | 123.2 | ₹5,93,577.6 |
| 1.07 | Providing and laying in position cement concrete of specified grade M-10 including curing but excluding the cost of centering and shuttering - All work upto plinth level with 1:2:4 (1 Cement : 2 coarse sand : 4graded stone aggregate 40 mm nominal size) | 42.52 | cum | 6,591.25 | ₹2,80,259.95 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc for mass concrete. | 260.22 | sqm | 286.35 | ₹74,514 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for:for suspended floor/beams /columns | 185.87 | sqm | 577.55 | ₹1,07,349.22 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1056680.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .