Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC L1 |
| 2 | l2₹9.9 LRejected-Finance | ₹9.9 L | l2 | Rejected-Finance not qualified |
| 3 | L3₹9.9 LRejected-Finance 804 2 P BLOCK KAKADEV KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.9 L | L3 | Rejected-Finance not qualified |
Tender Value
₹9.9 L
EMD Value
₹99,034
Closing Date
12 May 2026, 3:00 pmClosed
c.e kanpur nagar nigam
c.e office kanpur nagar nigam
zone-01 ke antargat Rizawi Raod Sunhari masjid se Moolganj wa Kalpi Road se Chamnganj H.M.P Marmmat Ka Kraya.
2026_NNKAN_1146619_1
195/AA-1/2025-26
Open Tender
Civil Works
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,034
3 Jul 2026
8 May 2026
12 May 2026
8 May 2026
12 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | construction of granular sub base (GSB) BY providing course graded material spreading in unifrom layer etc all comp. | 3.84 | cum | 3,671 | ₹14,096.64 |
| 1.02 | Providing and applying tack coat with bitumen VG-10using bitumen presure distributer @ 0.30 kg/sqm (VG-10) on the prepared bitumen/granular surface cleaned ith machainical broom.. | 1,723.74 | sqm | 18 | ₹31,027.32 |
| 1.03 | Dense Graded Bituminous Macadam (DGBM) Providingand Laying dense Graded Bitumiminour macadam with 60-90 TPH batch HMP producing an average output of 75 tonnes per hour crushed aggregates of specified grading permixed with bituminour [email protected] by weight of total mixand filer transporting the hot mix plant to work site laying with hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and tandem rollers to acheive the desired compaction as per Morth Speification clause No-507 complete in all respects. | 64.4 | MT | 4,940 | ₹3,18,136 |
| 1.04 | Providing and laying bitumenous concrete(B.C) with 100-120 TPH hot mix plant producing an average out put of 75 tonnes per hour using crused aggrigtes of specified grading premixed with bituminous binder (CRMB-55)@ 5.4% of mix, subject to job mix design. | 86.39 | MT | 5,510 | ₹4,76,008.9 |
| 1.05 | 18@GST | - | Tax | 1,51,068.39 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_2144400.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid