Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹54.4 L
EMD Value
₹54,500
Closing Date
22 Feb 2024, 10:43 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Karnataka Power Transmission Corporation Limited
sridhar
Replacement of 1x 6.3MVA and 1X8MVA 66/11KV Power Transformer by 2 x 12.5 MVA, 66/11KV Power Transformer at 66/11KV Halaguru Sub-Station in Malavalli Taluk, Mandya District On PTK Basis
KPTCL/2023-24/EL/WORK_INDENT644
KPTCL/2023-24/EL/WORK_INDENT644
Open
Electrical
Two Tender Document System(Two Cover)
KPTCL SEE Works and Mantainance Circle Mysuru
4 documents required · 0 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Should have carried out erection of all connected equipments of 01 One Transformer Bay of 110/66KV class or above voltage class on Total Turnkey or Partial Turnkey basis including erection of Transformer which shall be in satisfactory service for a period of One year prior to date of submission of the Bid OR b Should have carried out erection of all connected equipments of 02Two Transformer Bays of 110/66KV class or above voltage class on Labour Contract or as SubContract to any Turnkey Contractor including erection of Transformer in each terminal bay work which shall be in satisfactory service for a period of One year prior to date of submission of the Bid.Note The Labour Contractor or Sub-Contractor of a Turnkey Contractor shall also furnish/upload the following in support of the qualifying requirement. a Copy of the letter of approval or permission issued by the awarding agency to the turnkey contractor main permitting the Turnkey Contractor main to sub let the awarded work to the said Labour Contractor or Sub Contractor.b Copy of the work award issued by the Turnkey Contractor main to the said Labour Contractor or SubContractor.cThe agreement between the Turnkey Contractor ie main and the said Labour Contractor or SubContractor
For the purpose of this particular Bid,Bidders shall collectively meet the following minimum criteria 11.6.1Minimum Average Annual Turnover (MAAT) of the bidder for best three years out of last preceding fve fnancial years ending on March or December as the case may be, shall not be less than Rs.refer NIT which is calculated as noted belowRs(1.5 x estimated cost)Completion period in years.In case completion period is less than one(1) year the denominator to calculate MAAT shall be considered as one (1).In case bidder is a holding company MAAT shall be that of holding company only (i.e. excluding its subsidiary / group companies). In case bidder is a subsidiary of a holding company, MAAT shall be that of subsidiary company only (i.e. excluding its holding company)
The Prime Bidder who meets not less than 60% of the Financial Capabilities as specifed in 11.6.1and technical qualifying requirement prescribed in 11.3 is eligible to participate in the tender with consortium arrangement limited to a maximum of two (2) members including the prime bidder subject to entering in to a joint consortium agreement in the prescribed format (Annexure-XI). However, the Consortium shall collectively meet Technical and Financial qualifying requirements prescribed in 11.3 and 11.6.(I) Any one of the Consortium Partners shall meet the Technical Capability prescribed at 11. 3. (II) Financial requirement prescribed at 11.6 shall be met by any of the consortium partners or jointly by both the partners of the consortium.
Should upload valid Super grade licence
Should upload all relevant documents as per uploaded tender documents
₹1,370
₹54,500
8 Feb 2024
8 Feb 2024
23 Feb 2024
22 Feb 2024
Replacement of 1x 6.3MVA and 1X8MVA 66/11KV Power Transformer by 2 x 12.5 MVA, 66/11KV Power Transformer at 66/11KV Halaguru Sub-Station in Malavalli Taluk, Mandya District On PTK Basis
Replacement of 1x 6.3MVA and 1X8MVA 66/11KV Power Transformer by 2 x 12.5 MVA, 66/11KV Power Transformer at 66/11KV Halaguru Sub-Station in Malavalli Taluk, Mandya District On PTK Basis
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Volume IIB_Final.docx
Tender Document • 0.26 MB
Annexure.doc
Tender Document • 0.19 MB
Work on Hand details.doc
Others - works on hand • 0.06 MB
ECC_Halguru.doc
Tender Document • 0.11 MB
technocom_sheet.xls
Technical Information / Worksheet • 0.03 MB
ITB_Halguru.docx
Instructions to Tenderers • 0.06 MB
SCC_Halguru.doc
Instructions to Tenderers • 0.15 MB
IFB_HAlguru.docx
Instructions to Tenderers • 0.06 MB
GCC_Halguru.doc
Tender Document • 0.17 MB
NIT_Halguru.doc
Instructions to Tenderers • 0.06 MB
Volume IIA_Final.docx
Tender Document • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .