| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L7₹38.5 L+₹3.6 L (10.2%)Accepted-AOC | L7 | Accepted-AOC BONAFIDE AS PER CLAUSE NO 24.4 OF SCH A NOTES | |
| 2 | L1₹35.0 LRejected-Finance 39 ANAND INDUTRIAL ESTATE MOHAN NAGAR GHAZIABAD UTTAR PRADESH 201007 | GHAZIABAD | UTTAR PRADESH | 201007 | L1 | Rejected-Finance NON BONAFIDE | |
| 3 | L2₹38.5 L+₹3.6 L (10.2%)Rejected-Finance 110059 NEW DELHI NATIONAL CAPITAL TERRITORY OF DELHI 110059 | WEST DELHI | DELHI | 110059 | L2 | Rejected-Finance NON BONAFIDE | |
| 4 | L4₹38.5 L+₹3.6 L (10.2%)Rejected-Finance NO 9 BYRAVESHWARA INDUSTRIAL ESTATE ANDRAHALLI MAIN ROAD NEAR PEENYA 2ND STAGE BENGALURU 560 091 | BENGALURU URBAN | KARNATAKA | 560091 | L4 | Rejected-Finance NON BONAFIDE | |
| 5 | L5₹38.5 L+₹3.6 L (10.2%)Rejected-Finance FLAT NO 330 PKT 1 SECTOR 1 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L5 | Rejected-Finance NON BONAFIDE |
Tender Value
₹45.5 L
EMD Value
₹91,000
Closing Date
6 May 2020, 6:00 pmClosed
M ARIZ AHMED,IDSE
GE (U) ELECTRIC SUPLLY,DELHI CANTT-10
Manning and Operation of 11 KV Sub Station at BI Line Todapur Dhaula Kuan Part I Shopping Centre in the area of AGE U Elect Supply No II under GE U Electric Supply Delhi Cantt10
2020_MES_336911_1
GE ELECT/D-03/2020-2021
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE (U) ELECTRIC SUPLLY
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (U) ELECTRIC SUPLLY
₹91,000
Yes
11 May 2020
15 Apr 2020
8 May 2020
16 Apr 2020
6 May 2020
1 May 2020
Amount
Manning and Operation in Receiving-cum-Distribution Stn 11 KV round the clock by deployment of electrician in three shifts as specified, including Sunday and holidays under the concerned area under GE (U) E/S Delhi Cantt as per the schedule below :- BI Line Sub Station (11KV) :- (a) 1st shift from 0800 hrs to 1600 hrs. One Electrician. (b) 2nd shift from 1600 hrs to 0000 hrs. One Electrician. (c) 3rd shift from 0000 hrs to 0800 hrs. One Electrician. Todapur Sub Station (11KV) :- (a) 1st shift from 0800 hrs to 1600 hrs. One Electrician. (b) 2nd shift from 1600 hrs to 0000 hrs. One Electrician. (c) 3rd shift from 0000 hrs to 0800 hrs. One Electrician. Dhaula Kuan Part I Sub Station (11KV) :- (a) 1st shift from 0800 hrs to 1600 hrs. One Electrician. (b) 2nd shift from 1600 hrs to 0000 hrs. One Electrician. (c) 3rd shift from 0000 hrs to 0800 hrs. One Electrician. Shopping Centre Sub Station (11KV) :- (a) 1st shift from 0800 hrs to 1600 hrs. One Electrician. (b) 2nd shift from 1600 hrs to 0000 hrs. One Electrician. (c) 3rd shift from 0000 hrs to 0800 hrs. One Electrician.
Note:- (i) The contracotor will ensure suitable repalcement of electrician while on leave/weekly holidays and Wages for the same deemed to be included in the quoted rate. (ii ) The contractor shall ensure that electricians/ operator always be present in each shift. In case of absence of any worker the penalty @ Rs 100.00 per hours per electricians/ operator shall be imposed on the contractor. (iii) The contractor shall be responsible for maintaining the complete area (i.e. inside boundary wall ) such as building , hard standing , foothpath etc in neat and clean position . All necessary T&P for cutting /cleaning of grass and vegitation will be arranged by contractor without any extra cost. (iv) The contractor shall provide uniform , raincoat, protective clothing such as hand gloves ,helmet, safety belt , first aid box and shoes etc to all persons on duty and the cost of the same is deemed to be included in quoted rate. (v) Person employed should be working experience of working on HT and LT Installation. (vi) The contractor shall provide log sheet and maintain the the same on daily basis and the cost of the same is deemed to be included in quoted rate.
Worker's wage per person per day
Employees Provident Fund as per existing rules
Employees state insurance as per existing rules.
Contribution of Bonus as per existing rules.
Over head & profit on total of srl No 1.02 to 1.05
LWC as per existing rules on total of srl no 1.02 to 1.06.
GST (18%) as per existing rules on total of srl no 1.02 to 1.06.
V r traders
The new hut furnitures
Vijay Electricals
POWER ELECTRONICS ENGINEERS
MV Engineers And Contractors
AMIT ASSOCIATES
Rahul Enterprises
Third Wave Services Pvt Ltd
Choice india
M/s JAIMAA ASSOCIATES
Microsys Controls India
V.K. Enterprises
Rajindera Enterprises
Buddham Builders
Adhunik Builders
Hitech Erectors Pvt. Ltd.
mayur enterprises
Ridhi engineers and builders
stage.html
html • 0.10 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .