Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | ₹6.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹6.6 L+₹202.90 (0.03%)Rejected-AOC 93 SOUTH ZONE COIMBATORE CORPORATION | ERODE | TAMIL NADU | 638459 | ₹6.6 L+₹202.90 (0.03%) | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | PERUMAL L1 | SHARVESH AND COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 2 | M3 | 5,071 ₹10,142 Lowest | 5,071.3 ₹10,142.6 |
| 2.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 16 | M3 | 125 ₹2,000 Lowest | 128.1 ₹2,049.6 |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 2 | M3 | 5,962 ₹11,924 Lowest | 5,962.25 ₹11,924.5 |
| 4.00Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | |||||
| 4.01 | Sidewall | 180 | M2 | 534 ₹96,120 Lowest | 534 ₹96,120 Lowest |
| 5.00 | Conveying the excavated earth,desilting materials dismantling concrete from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 13 | M3 | 100 ₹1,300 Lowest | 104 ₹1,352 |
| 6.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 27 | Qtl | 9,540 ₹2,57,580 Lowest | 9,542.1 ₹2,57,636.7 |
| 7.00 | Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 29 | M3 | 9,743 ₹2,82,547 Lowest | 9,744.5 ₹2,82,590.5 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
3 Dec 2025, 3:00 pmClosed
Assistant Commissioner West Zone
West Zone, Coimbatore Corporation
Improvement Works to the Bridge at SPK Nagar in Ward no 37 of West Zone
2025_MAWS_624559_10
E6/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹8,000
11 Apr 2026
20 Nov 2025
4 Dec 2025
21 Nov 2025
3 Dec 2025
21 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.32 MB
BOQ
BOQ • 0.26 MB
Tender Documents
Tender Documents • 0.66 MB
Additional Documents
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .