| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52,778.49Admitted-Finance | -8.87% | ₹52,778.49 | L1 | Admitted-Finance |
| 2 | L2₹60,741.88Admitted-Finance | +4.88% | ₹60,741.88 | L2 | Admitted-Finance |
| 3 | L3₹61,344.20Admitted-Finance | +5.92% | ₹61,344.20 | L3 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
27 Apr 2026, 6:55 pmClosed
Commissioner, Municipal Corporation Udaipur
Municipal Corporation Udaipur, Town Hall Link Road
Repairing Patch and Jhiri work at EX.EN ZONE-1 (e_04 / Nirman_10)
2026_DLB_552077_1
E_04_2026-27_Nirman_10
Open Tender
Civil Works
365 days
Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Commissioner, Municipal Corporation Udaipur
₹3 L
Yes
4 May 2026
16 Apr 2026
28 Apr 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and crosssections, including disposal of surplus material with all lift and leadupto 1000 metre as per MoRT&H specification clause 301. In all type of soil | - | cum | - | - |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth upto 3km | - | cum | - | - |
| 3 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material withwater at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per
MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | - | cum | - | - |
| 4 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing ofbinding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | - | sqm | - | - |
| 5 | Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | - | sqm | - | - |
| 6 | Providing and laying bituminous macadam in 50/75 mm compacted thickness on prepared surface with specified graded crushed stone aggregates as per Table 500-4, Grading-II for base/ binding course, loading of aggregate with F.E. loader, heating and mixing of stone aggregate and bitumen in computerised hot mix plant, transported to site by tippers to paver, laid over a previously prepared surface with paver finisher fitted with electronic sensing device to the required grade, level and alignment and rolling with power roller and vibratory compactor as per clauses 501.6 and 501.7 to achieve the desired compaction complete as per clause 504 of MoRT&H specification and including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding cost of primer/ tack coat. With Bitumen VG-grade 30 @ 3.3% (percentage by weight of total
mix) | - | cum | - | - |
| 7 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at
OMC, carriage of mixed Material to work site, spreading in uniform
layers with motor grader on prepared surface and compacting with
vibratory power roller to achieve the desired density, complete as
per MoRT&H specification clause - 401 including all material, labour,
machinery, lighting, guarding and maintenance of diversion. Grading - I Material | - | cum | - | - |
| 8 | Providing and laying open graded premix carpet 20mm thick (compacted), on prepared surface in a single course as wearing With Bitumen VG-grade 30course, composed of specified graded crushed stone aggregate as per Table 500-23, premixed with bituminous binder @ 14.60 kg/10sqm (including Cost of anti stripping compound Minimum 1% in Lime/Cement as per design wherever required), including loading of material with F.E. loader, hot mixing of stone aggregate and bitumen in computerised hot mix plant, transporting the mixed material bytippers to paver and laying with paver finisher fitted with electronic sensor control to the required level and grade, compacting smooth wheeled roller 8-10 tonne capacity and finishing to required level toachieve the desired density as per clause 511 of MoRT&Hspecification including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding cost of tack coat/ seal coat. With Bitumen VG-grade 30 8.12.1 | - | sqm | - | - |
| 9 | Providing and laying premixed seal coat using hot mix plant and paver finisher with aggregate of 6.7mm size defined as 100% passing through 11.20mm sieve and retain on 2.36mm sieve with 0.09 cum per 10 sqm premix with bitumen binder @ 4.5% and rolling with power roller 8-10 tonne complete as per clause 513 of MoRT&H
specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. 8.16.1 With Bitumen VG-grade 30 | - | sqm | - | - |
| 10 | Filling of Pot- holes and patch repairs with Built up Spray Grout in two layers with 53-22.4mm size of aggregate upto 75mm depth and removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling
the pot holes with hot bituminous material as per clause 506, compacting with 8-10 tonne power roller, trimming and finishing the surface to form a smooth continuous surface complete using
Bitumen VG-grade 30 as per clause 503, 506 & 3004.2 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. 12.1 | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_983924.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid