| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹56.3 LAdmitted-Finance | -26.99% | ₹56.3 L | L1 | Admitted-Finance |
| 2 | L1₹56.3 LAdmitted-Finance | -26.99% | ₹56.3 L | L1 | Admitted-Finance |
| 3 | L2₹57.7 L+₹1.3 L (2.38%)Admitted-Finance | -25.25% | ₹57.7 L+₹1.3 L (2.38%) | L2 | Admitted-Finance |
| 4 | L2₹57.7 L+₹1.3 L (2.38%)Admitted-Finance AT NEAR TRUPTI ICE FACTORY WARD NO 16 P O P S DISTRICT JAGATSINGHPUR | -25.25% | ₹57.7 L+₹1.3 L (2.38%) | L2 | Admitted-Finance |
| 5 | L3₹61.7 L+₹5.4 L (9.57%)Admitted-Finance | -20.00% | ₹61.7 L+₹5.4 L (9.57%) | L3 | Admitted-Finance |
Tender Value
₹77.2 L
EMD Value
₹77,153
Closing Date
10 Aug 2026, 5:00 pmClosed
Superintending Engineer
Office of the superintending engineer, Jagatsinghpur R and B Division
Construction of New Hall at Collectorate Building (Second Floor) Jagatsinghpur for the year 2025-26.
2026_EICCL_137382_1
NOTICE NO.S.E. JSPR (R-B)-05 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Jagatsinghpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹77,153
Yes
14 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (Civil Work) Dismantling & removing RCC Columns / Beams / Slab including stacking the useful materials for reuse & removing the debris within 50m lead with cost of all labour etc. complete. | 10.88 | Cum | 1,644.68 | ₹17,894.12 |
| 2 | Dismantling & removing Brick Masonry in C.M./L.M. including stacking the useful materials for reuse & removing the debris within 50m lead with cost of all labour etc. complete. | 1 | Cum | 1,815.4 | ₹1,813.58 |
| 3 | R.C.C. work of M-25 grade having minimum compressive strength in work test of 250 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position. (Coloumn SS) | 25.19 | Cum | 21,630.36 | ₹5,44,868.77 |
| 4 | Wall Beam & Roof Beam | 23.77 | Cum | 21,630.36 | ₹5,14,153.66 |
| 5 | Lintel | 3.88 | Cum | 19,226.84 | ₹74,600.14 |
| 6 | Chajja | 15.61 | Cum | 1,711.13 | ₹26,710.75 |
| 7 | Roof Slab | 39.14 | Cum | 18,655.9 | ₹7,30,191.93 |
| 8 | Straightening cutting, bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S. rods or tor confirming to I.S. 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C. works including cost, conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour with all T&P required for the work etc. complete as directed by the Engineer- in-Charge. | 141.46 | Qtl | 9,353.58 | ₹13,23,162.1 |
| 9 | Fly ash brick masonry in cement mortar (1:6) on Supperstructure using Fly ash bricks of 125cmx12cmx8cm size having a crushing strength of not less than 75 kg per Sq.cm with dimensional tolerance + 8 percent after immersing Bricks for six hours in waters before use with all necessary projections, splays cutting, circular moulding, chamfering, corbelling, watering, curing etc. complete including cost, conveyance, royalties, taxes of all materials, cost of all labour, all T&P etc. complete in all respect as directed by the Engineer-in-charge. | 67.85 | Cum | 6,435.54 | ₹4,36,651.56 |
| 10 | Providing 16 mm thick C.P. with C.M. (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and taxes of all materials with cost of all labour, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. | 301.93 | Sqm | 290.98 | ₹87,855.59 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_603751.xls
BOQ • 0.77 MB
CollectorateSFDTCN.pdf
Tender Documents • 5.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .