Tender Value
₹38.9 L
EMD Value
₹39,000
Closing Date
5 Sept 2026, 5:00 pm
SE(CIVIL)
CIVIL WORKS CIRCLE,OPTCL BBSR
Construction of periphery road around 132 KV switchyard at 132/33KV GSS, OPTCL,Purusottampur
2026_OPTCL_138971_12
OPTCL-CVL-SE - E-04 - 2026-27
Open Tender
Civil Works - Others
Percentage
120 days
PURUSOTTAMPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
SE(CIVIL),CIVIL WORKS CIRCLE,OPTCL
₹39,000
Yes
20 Aug 2026
20 Aug 2026
11 Sept 2026
20 Aug 2026
5 Sept 2026
20 Aug 2026
20 Aug 2026 - 28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all labour for dismantling cement concrete including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | - | cum | 1 | - |
| 2 | Supplying all labour with t & P required for lifting and removing structural members from site by using 3 tonnes cranes / hydra/ any other lifting machines including cost taxes of all labour with T & P required etc complete in all respect as per direction of EIC. | - | mhrs | - | - |
| 3 | Earthwork in excavation in hard soil on foundation trenches in all kinds of soil including moorum stony earth and earth mixed with boulder except sheet rocks and boulders requiring blasting including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring and shuttering , dewatering if required etc complete including cost,conveyance,taxes of all labour with T&P required etc complete as per the direction of the Engineer in charge. | - | cum | 1 | - |
| 4 | Supplying all labour with t & P required for removal of excess earth by mechanical means up to a distance of 5 KM including cost taxes of all labour with T & P required etc complete in all respect as per direction of EIC. | - | cum | 1 | - |
| 5 | Supplying all labour with T&P for rolling and compacting to sub grade or formation loosening by scarify of road surface 0.15 mtr depth including watering and rolling by PRR as per specification and direction of the EIC including cost, conveyance and taxes of all materials and cost,conveyance and taxes of all labour and T&P required for the work etc complete as per the direction of the EIC. | - | cum | - | - |
| 6 | Supplying all labour with T and P required for spreading of screened dust and consolidatin with PRR etc with watering and curing including cost, conveyance, royalties and taxes of all materials and cost, conveyance of all labour with T&P required for the work etc complete in all respect s as per the direction of the Engineer in charge. | 1 | cum | 1 | ₹1 |
| 7 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP - 63:2018. | - | sqm | 1 | - |
| 8 | Supplying all labour with T&P for filling foundation and plinth with sand including watering, ramming etc comolete including cost , conveyance , royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete (measurement will be taken on finished & complete section only) as per the direction of the Engineer in charge. | 1 | cum | 1 | ₹1 |
| 9 | Cement concrete with (1:3:6) in foundation and floors using 40 mm ( 1 ½ ‘’) size black hard crusher broken granite stone metal of approved quality from approved quarry including lower laying concrete watering and curing etc complete to required level laid in layers not exceeding 150 mm ( 6’’) thick including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. | 1 | cum | 1 | ₹1 |
| 10 | Providing and laying C.C pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator,vacuum dewatering process and finally finished by floating,brooming with wire brush etc complete, watering and curing to attain required strength etc complete including cost conveyance royalty taxes of all materials and cost conveyance of all labour with t&P ,equipments and accessories and provision for all arrangements required for the works etc complete in all respect as per the direction of the EIC. (the panel shuttering work shall be paid for separately) | - | cum | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tendernotice_2.pdf
PDF • 1.47 MB
Tendernotice_3.pdf
PDF • 4.50 MB
Tendernotice_4.pdf
PDF • 1.15 MB
Tendernotice_5.pdf
PDF • 1.31 MB
BOQ_606463.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].