Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹95.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹98.9 L+₹3.9 L (4.10%)Rejected-AOC | 2 | Rejected-AOC L2 |
Tender Value
₹97.7 L
EMD Value
₹97,700
Closing Date
12 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Diretor
DRDA Namakkal
Upgradation/ Strengthening/Periodic Renewal and Five year Maintenance of1Road works inNamagiripetBlock of Namakkal District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT)- 2022-23.Pa.No46 /NKL/MGSMT 2022-23
2023_RDTN_308350_57
DIPR/2142/Tender/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Namagiripettai
Required Documents as Per Schedule
4 documents required · 4 mandatory
₹0
₹97,700
Yes
DRDA Namakkal
30 Jun 2023
29 Apr 2023
12 May 2023
29 Apr 2023
12 May 2023
5 May 2023
5 May 2023
Amount
Strengthening the Road from Oduvankurichi to Jedarpalayam Road Via Perumagoundampalayam Panchayat Limit KM 0/0 - 2/340 H/O Perumagoundampalayam (Road Code-46)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking 5 cm to 10 cm old metalled surface and sectioning including all labourcharges.etc. complete.
Earth work excavation and depositing on bank with intial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Provision for Road Marking including all cost and conveyance labour and Material charge etc, Complete
Providing and fixing of Sign boards
a. 60cm Equilateral tringle cautionary signboard
b. Curved Board
KM Stone
HM Stone
Sub Estimate (Retaining wall -KM 0/0 -1/0
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Centering for Sides and Soffits of Concrete wall using Steel Centering including hire charges for all materials and labour etc.
Cement Concrete in 1 : 3 : 6 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Provision for Weep Holes including cost all charges etc,complete
Sub Estimate (Retaining wall -KM 1/0 -2/0
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Centering for Sides and Soffits of Concrete wall using Steel Centering including hire charges for all materials and labour etc.
Cement Concrete in 1 : 3 : 6 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Provision for Weep Holes including cost all charges etc,complete
Sub Estimate (Pipe Culvert - CH 827m)
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Sub Estimate (1.50 M Span Culvert - CH 725m)
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Centering for Sides and Soffits of Concrete wall using Steel Centering including hire charges for all materials and labour etc.- Below Sill
Centering for Sides and Soffits of Concrete wall using Steel Centering including hire charges for all materials and labour etc - Above sill
Centering for Sides and Soffits of Concrete wall using Steel Centering including hire charges for all materials and labour etc.- Deck Slab
Cement Concrete in 1 : 3 : 6 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Suppling fabricating and placing in position of steel reinforcement as per design given by department and as per specification. As per calculation
RCC 1:2:4-using 20mm ISS HBGS jelly including cost of laying and curing but excluding the cost of centering and steel etc., complete.
RCC 1:11/2:3-using 20mm ISS HBGS jelly for all R.C.C works including cost of laying and curing but excluding the cost of centering and steel etc., complete.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Anbarasu EK
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .