Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-Finance | ₹28.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹32.2 L+₹3.6 L (12.7%)Rejected-Finance | ₹32.2 L+₹3.6 L (12.7%) | L2 | Rejected-Finance L2 |
| 3 | L3₹33.0 L+₹4.4 L (15.6%)Rejected-Finance | ₹33.0 L+₹4.4 L (15.6%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹38.8 L
EMD Value
₹77,600
Closing Date
23 Jul 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Providing and Fixing Open Gym Equipment for Play Ground and Maintenance of Shamshan sthal Boundary wall and Kutte home work in Village - Ahmadpur choroli , YEA WC-06
2026_YEIDA_1168792_15
YEA/GM(PROJECT)/2026/542 DT-10/07/2026
Open Tender
Civil Works
Fixed-rate
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹980
₹77,600
7 Sept 2026
15 Jul 2026
24 Jul 2026
15 Jul 2026
23 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom.Lifts up to 1.50 m including getting out the excavated soil and disposal of surplus excavated soil as directed with in a lead of 50m. (MOST/A.R./YEIDA) | 74.78 | Cum | 1 | ₹74.71 |
| 2 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all material, Labour, Tools&plants etc required for proper completion of the work. | 22.45 | Cum | - | - |
| 3 | B/W with bricks of class 150 in foundation & plinth in CM 1:4 (Based on UP PWD SOR 2020) Cement mortar 1:4 ( 1cement :4Coarse sand) | 54.72 | Cum | - | - |
| 4 | M-150 brick work in 1:4 one cement and four course sand 2.20 F.M. mortar superstructure but for walls of half brick thick including supply of all material, labour, T&P etc. required for proper completion of the work. (UPPWD/SOR-2020/305(a)+310A | 54.53 | Cum | - | - |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level | 5.4 | Cum | 1 | ₹5.4 |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).All works above plinth level upto floor V level | 4.02 | Cum | 1 | ₹4.02 |
| 7 | Centring and shuttering including strutting, propping etc. and removal of form for : foundation footings, base of column | 2.4 | Sqm | - | - |
| 8 | Centring and shuttering including strutting, propping etc. and removal of form for : lintels, beams, plinth beam, grinder | 73 | Sqm | 1 | ₹72.99 |
| 9 | Centring and shuttering including strutting, propping etc. and removal of form for : suspended floors, roofs, landings | 58.37 | Sqm | - | - |
| 10 | Edges of slabs and breaks in floors and walls: Under 20 cms wide.
(DAR/5.9.16.1/Based on UPPWD/SOR-2020)) | 41 | R.m | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
15.pdf
Tender Documents • 1.60 MB
BOQ_2194489.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .