| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.8 L+₹3,113.99 (1.71%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S MUNANDRA SINGH WORK CONTRACTOR L1 | M/S JAIVEER SINGH S/O N SINGH THEKEDAR L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and Fixing Steel Gate including cost of all materials - MS Rod 50 mm , Steel Angle 75x75x6 mm , MS Beam 150x75x8 mm, MS Channel 100x50x8 mm, Bearing Plate 300x300x12 mm Febrication , Required T&P, Welding etc and Operating Lock Key , Eraction of Gate by Chain pully , Painting with Red oxide Zink Primer with high build black bituminous paint of standard make , Oiling & Greasing Complete Gate Carriage upto Work Site. | 1.93 | SqM | 69,000 ₹1,33,170 Lowest | 70,200 ₹1,35,486 |
| 2.00 | Brick Work (M 105 and above) in 1:4 cement & sand mortar including cost of all materials , Labour , T&P etc complete (Per CUM) | 1.45 | CuM | 5,115 ₹7,416.75 Lowest | 5,130 ₹7,438.5 |
| 3.00 | Laying 12.5 mm thick Cement Plaster 1:4 CM using coarse sand including all cost of material, labour , T&P etc. for completion of work per SqM | 9.61 | SqM | 80.4 ₹772.64 Lowest | 82 ₹788.02 |
| 4.00 | Supplying and Laying C.C 1:1.5:3 in using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum. | 1.88 | CuM | 6,693.5 ₹12,583.78 Lowest | 6,700 ₹12,596 |
| 5.00 | Finishing wall with Superior quality water proof cement paint weather coat of approved quality on previsously new surface with this paint to given an even shade including supply of all materials , labours, T&P etc required for proper completion of the work. | 9.58 | SqM | 133.2 ₹1,276.06 Lowest | 135 ₹1,293.3 |
| 6.00 | Supply & Laying of reinforcement including cutting , Bending , Binding and Placing etc. including coast of all labour and T&P etc. complete as directed by Engi-In-Charge. | 15.61 | Kg | 6.6 ₹103.03 Lowest | 6.9 ₹107.71 |
| 7.00 | Earth work in filling for making of proper channel section in all type of soil dressing manual compection including 1.5 m lift and 600 m lead of earth , labour and T&P etc complete | 121.12 | CuM | 219 ₹26,525.28 Lowest | 225 ₹27,252 |
Tender Value
₹1.9 L
EMD Value
₹3,760
Closing Date
22 Sept 2025, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E.
E.G.C.C.D-4, Bijnor
Supply and Fixing of Steel Gate at Cross Regulator at km 4.270 of Husainpur Dy for year 2025 -26
2025_UPIDC_1072625_10
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Wise
10 days
Bijnor
Please refer Tender documents.
2 documents required · 2 mandatory
₹89
₹3,760
15 Oct 2025
11 Sept 2025
22 Sept 2025
11 Sept 2025
22 Sept 2025
11 Sept 2025
Amount
Providing and Fixing Steel Gate including cost of all materials - MS Rod 50 mm , Steel Angle 75x75x6 mm , MS Beam 150x75x8 mm, MS Channel 100x50x8 mm, Bearing Plate 300x300x12 mm Febrication , Required T&P, Welding etc and Operating Lock Key , Eraction of Gate by Chain pully , Painting with Red oxide Zink Primer with high build black bituminous paint of standard make , Oiling & Greasing Complete Gate Carriage upto Work Site.
Brick Work (M 105 and above) in 1:4 cement & sand mortar including cost of all materials , Labour , T&P etc complete (Per CUM)
Laying 12.5 mm thick Cement Plaster 1:4 CM using coarse sand including all cost of material, labour , T&P etc. for completion of work per SqM
Supplying and Laying C.C 1:1.5:3 in using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Finishing wall with Superior quality water proof cement paint weather coat of approved quality on previsously new surface with this paint to given an even shade including supply of all materials , labours, T&P etc required for proper completion of the work.
Supply & Laying of reinforcement including cutting , Bending , Binding and Placing etc. including coast of all labour and T&P etc. complete as directed by Engi-In-Charge.
Earth work in filling for making of proper channel section in all type of soil dressing manual compection including 1.5 m lift and 600 m lead of earth , labour and T&P etc complete
M/S JAIVEER SINGH S/O N SINGH THEKEDAR (BID ID -5550484)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .