Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC NEW MARKET SINGRAULI DISTT SINGRAULI MP 486889 | SINGRAULI | SINGRAULI | MP | 486889 | ₹3.9 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹4.0 LRejected-Finance 00 BHADAR TIKARMAFI BAZAR SULTANPUR UTTAR PRADESH 227413 | AMETHI | UTTAR PRADESH | 227413 | ₹4.0 L | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹4.0 LRejected-Finance ALAKHRAJ BHAWAN NEAR MAMTA MOTORS BHUSA MORE WARD NO 7 SINGRAULI M P 486889 | SINGRAULI | MADHYA PRADESH | 486889 | ₹4.0 L | L3 | Rejected-Finance L3 bidder |
| Sl No | Description | Qty | Unit | KUNWAR & SINHA ENGINEERING WORKS | M/s. Dev Enterprises | M/S. ATUL ENTERPRISES |
|---|---|---|---|---|---|---|
| 1.00 | Erecting steel tubular poles (9 mtr, 11 mtr and 13 mtr) in a vertical position, including transportation to the designated location, excavation of a pit measuring 0.9 x 0.9 x 1.83 meters, and disposal of surplus soil up to a distance of 50 meters | 50 | Nos. | 75,000 ₹88,500 | 42,250 ₹49,855 | 35,000 ₹41,300 |
| 2.00 | Dismantling steel tubular poles (9 mtr, 11 mtr and 13 mtr) and transporting them to the designated location | 30 | Nos. | 18,000 ₹21,240 | 11,700 ₹13,806 | 12,000 ₹14,160 |
| 3.00 | Installation of single pole brackets on a steel pole using 5/8" MS bolts, nuts, and washer clamps (all fasteners provided by the contractor) | 150 | Nos. | 60,000 ₹70,800 | 15,000 ₹17,700 | 10,500 ₹12,390 |
| 4.00 | Supply and installation of pin insulator with pin on pole brackets as per the instructions of the EIC | 150 | Nos. | 30,000 ₹35,400 | 12,300 ₹14,514 | 30,000 ₹35,400 |
| 5.00 | Stringing of conductor, including necessary jumpering and joining as required | 9 | km | 31,500 ₹37,170 | 17,100 ₹20,178 | 18,000 ₹21,240 |
| 6.00 | Stringing and laying of 7/14 SWG GI earth wire | 2 | km | 5,000 ₹5,900 | 1,800 ₹2,124 | 4,000 ₹4,720 |
| 7.00 | Supply and installation of a 5’/8’ x 6” stay set, including an anchor plate, bow thimble, nuts and bolts, stay insulator, stay wire, and all necessary accessories | 50 | Nos. | 17,500 ₹20,650 | 20,000 ₹23,600 | 21,500 ₹25,370 |
| 8.00 | Supply of 7/14 SWG GI earth wire | 360 | kg | 32,400 ₹38,232 | 27,000 ₹31,860 | 34,200 ₹40,356 |
| 9.00 | Supply of cement for grouting poles and stays | 50 | Bags | 15,000 ₹17,700 | 12,750 ₹15,045 | 12,500 ₹14,750 |
| 10.00 | Providing and fixing 125A TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required | 15 | Nos. | 15,000 ₹17,700 | 58,500 ₹69,030 | 31,500 ₹37,170 |
Updated dates
Tender Value
₹4.4 L
EMD Value
₹5,500
Closing Date
20 Apr 2026, 6:55 pmClosed
Staff Officer (ENM)
SO(ENM), AGM/JRD office
Erection, dismantling and maintenance of HT/LT OH line and providing guarding at crossings and identified spans in Jhingurda Township
2026_NCL_358058_1
NCL/JRD/ENM/Tender/26-27/03 Dt.06.04.2026
Open Tender
Electrical and Maintenance Works
120 days
Jhingurda Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,500
2 Jun 2026
6 Apr 2026
21 Apr 2026
6 Apr 2026
20 Apr 2026
6 Apr 2026
6 Apr 2026 - 13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Erecting steel tubular poles (9 mtr, 11 mtr and 13 mtr) in a vertical position, including transportation to the designated location, excavation of a pit measuring 0.9 x 0.9 x 1.83 meters, and disposal of surplus soil up to a distance of 50 meters | - | Nos. | - | - | item1 |
| 2 | Dismantling steel tubular poles (9 mtr, 11 mtr and 13 mtr) and transporting them to the designated location | - | Nos. | - | - | item2 |
| 3 | Installation of single pole brackets on a steel pole using 5/8" MS bolts, nuts, and washer clamps (all fasteners provided by the contractor) | - | Nos. | - | - | item3 |
| 4 | Supply and installation of pin insulator with pin on pole brackets as per the instructions of the EIC | - | Nos. | - | - | item4 |
| 5 | Stringing of conductor, including necessary jumpering and joining as required | - | km | - | - | item5 |
| 6 | Stringing and laying of 7/14 SWG GI earth wire | - | km | - | - | item6 |
| 7 | Supply and installation of a 5’/8’ x 6” stay set, including an anchor plate, bow thimble, nuts and bolts, stay insulator, stay wire, and all necessary accessories | - | Nos. | - | - | item7 |
| 8 | Supply of 7/14 SWG GI earth wire | - | kg | - | - | item8 |
| 9 | Supply of cement for grouting poles and stays | - | Bags | - | - | item9 |
| 10 | Providing and fixing 125A TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required | - | Nos. | - | - | item10 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.26 MB
ANNEXURE.pdf
Tender Documents • 0.73 MB
BOQ_370945.xls
BOQ • 0.32 MB
LOB.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid