Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -3.00% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 LAdmitted-Finance | -2.22% | ₹2.9 L | L2 | Admitted-Finance |
| 3 | L3₹2.9 LAdmitted-Finance | -1.22% | ₹2.9 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Concern Panchayat Residence proof not uploaded |
Updated dates
Tender Value
₹3.0 L
EMD Value
₹5,960
Closing Date
3 Feb 2026, 6:00 pmClosed
Executive Engineer REW Jammu
Executive Engineer REW Jammu
construction of Lane and drain from Link road to Parvinder kour house w.no.1 village and pyt. Makhanpur Gujran. Pyt. Makhanpur Gujran Block Miran Sahib under CDF for the Financial year 2025-26.
2026_RDPR_300869_3
e-NIT No. 749 REWJ of 2025-26 dated 17-01-2026
Open Tender
Civil Works
45 days
Executive engineer REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,960
5 Feb 2026
17 Jan 2026
4 Feb 2026
17 Jan 2026
3 Feb 2026
17 Jan 2026
General site clearance including levelling of ground and disposal of material. (LS)
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge:1:3:6 or richer mix (i/c equivalent design
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. 15.23.1 For thickness of tiles 10 mm to 25 mm
Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil.
Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level
Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level.
Centring and shuttering including strutting, propping etc and removal of the formwork.
Cement concrete flooring 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete 50mmthick with 20 mm nominal size stone aggregate
12mm Cement plaster of mix1 : 6 ( 1 cement : 6 coarse sand)
Providing and lying 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design /shape laid in required colour and pattern over and including 50 mm thick compacted bed of fine sand ,filling
Carriages of material by MT Sand 15 km
Carriages of material by MT Agg 15 km
Providing and fixing of marble sign board with complete job
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_975965.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid