| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC AKRA KRISHNANAGAR MAHESHTALA KOLKATA 140 | KOLKATA | WEST BENGAL | 700001 | ₹5.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.9 LRejected-Finance | ₹5.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹6.1 LRejected-Finance 6 3 EAST PHOOL BAGAN KOLKATA KOLKATA 700086 | KOLKATA | WEST BENGAL | 700086 | ₹6.1 L | L3 | Rejected-Finance L3 |
Tender Value
₹5.8 L
EMD Value
₹11,600
Closing Date
24 Jan 2026, 11:00 amClosed
D.G. (UTTARAN SERVICES)
516, D. H. ROAD, KOL-34
CONST. OF SURFACE DRAIN BY PROVIDING COVER SLAB AT SURYA SEN NAGAR(SLUM AREA) NEAR PRE. NO. 243, 225 AND 251 ETC. IN WARD NO. 127
2026_KMC_988743_1
KMC/DG(US)/XIV/127/161/25-26
Open Tender
CIVIL WORKS
21 days
WARD-127
PLEASE REFER TENDER DOCUMENTS.
5 documents required · 5 mandatory
₹0
₹11,600
3 May 2026
16 Jan 2026
27 Jan 2026
16 Jan 2026
24 Jan 2026
16 Jan 2026
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-4)
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1)
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 17. 125 mm. thick brick work with 1st class bricks in cement mortar (1:3) in ground floor.
SECTION 1 BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
SECTION 1 BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (a) Where staging is required. ( Ref :PWD (Rds & Brdgs)-2018, Page No. 332, It. No. 18.05)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety ( Ref :PWD (Bldg.)-2017, page-26 (item -10(i), consumption chart pg-B-60, sl-3 and Annexture-II , Format-A, 3rd Corrigenda & addenda p-13 dtd-04.06.2018, PWD(R&B) 2018, Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2415617.xls
BOQ • 0.27 MB
TForm.pdf
Tender Documents • 0.39 MB
civil.pdf
Additional Documents • 3.53 MB
Download all tender documents and submit your bid