Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹2.2 L+₹30,943.95 (16.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹2.3 L+₹37,570.91 (19.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹2.5 L+₹53,091.91 (27.4%)Admitted-Fee/PreQual/Technical/Finance 1035 A 2ND FLOOR J V STREET SUDHAKAR NAGAR VILUPPURAM | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹2.6 L+₹67,201.91 (34.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | G VEERAPPAN L1 | NR INFRA L5 | DEVAKI CONSTRUCTIONS L4 | HARI CONSTRUCTION L2 | S Keerthika L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Reconstruction of Surplus Weir @ Ramananthangal Eri in Anniyu Panchayat | ||||||||
| 1.01 | Dismantling clearing away and carefully stacking material usefull for reuse for any thickness of walls in brick or stone massonry in Cement mortar walls under 3m height including all labour charges etc complete | 5.54 | cum | 206.69 ₹1,145.06 Lowest | 283 ₹1,567.82 | 283 ₹1,567.82 | 240.61 ₹1,332.98 | 283 ₹1,567.82 |
| 1.02 | Dismantling clearing away and carefully stacking materials useful for re-use, for any thickness in Plain Cement Concrete including all labour charges etc complete | 5.44 | cum | 354.93 ₹1,930.82 Lowest | 486.2 ₹2,644.93 | 486.2 ₹2,644.93 | 413.23 ₹2,247.97 | 486.2 ₹2,644.93 |
| 1.03Supplying and erecting steel centering for sides and soffits including all support with all cross bracing using mild steel of size 90cm x 60cm 10 Guage stiffened with welded mild steel angle of size 25x25x3mm for boarding and providing silver oak joist 75cm x 5cm spaced at about 45cm C/c and supported by casurina,d below GL upto 3m height. including all labour charges etc complete | ||||||||
| 1.04 | Below GL | 97.5 | sq.m | 399.68 ₹38,968.8 Lowest | 547.5 ₹53,381.25 | 547.5 ₹53,381.25 | 465.36 ₹45,372.6 | 547.5 ₹53,381.25 |
| 1.05 | Above GL | 68.38 | sq.m | 799.35 ₹54,659.55 Lowest | 1,095 ₹74,876.1 | 1,095 ₹74,876.1 | 930.74 ₹63,644 | 1,095 ₹74,876.1 |
| 1.06 | Cement Concrete : 1:3:6 with broken stone jusing 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete. | 14.11 | cum | 4,460.92 ₹62,943.58 | 6,000 ₹84,660 | 5,000 ₹70,550 | 5,193.97 ₹73,286.92 | 3,900 ₹55,029 Lowest |
| 1.07 | Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete. | 6.05 | Mt | 5,217.3 ₹31,564.67 Lowest | 7,146.99 ₹43,239.29 | 7,146.99 ₹43,239.29 | 6,087.1 ₹36,826.96 | 7,146.99 ₹43,239.29 |
| 1.08 | Towards Name Board Charges | 1 | no | 2,190 ₹2,190 | 500 ₹500 Lowest | 500 ₹500 Lowest | 1,500 ₹1,500 | 500 ₹500 Lowest |
| 1.09 | Towards Photography Charges | 1 | no | 365 ₹365 | 100 ₹100 Lowest | 100 ₹100 Lowest | 500 ₹500 | 100 ₹100 Lowest |
Tender Value
Refer Docs
EMD Value
₹3,150
Closing Date
23 Sept 2026, 3:00 pmClosed
BDO(BP)
Kanai
TNVPM/Kanai/15th CFC/Admin and Savings/2026-27/04
2026_RDTN_705020_1
TNVPM/Kanai/15th CFC/Admin and Savings/2026-27/04
Open Tender
Civil Construction Goods
Works
60 days
Kanai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,150
Yes
23 Sept 2026
16 Sept 2026
23 Sept 2026
16 Sept 2026
23 Sept 2026
16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reconstruction of Surplus Weir @ Ramananthangal Eri in Anniyu Panchayat | |||||
| 1.01 | Dismantling clearing away and carefully stacking material usefull for reuse for any thickness of walls in brick or stone massonry in Cement mortar walls under 3m height including all labour charges etc complete | 5.54 | cum | - | - |
| 1.02 | Dismantling clearing away and carefully stacking materials useful for re-use, for any thickness in Plain Cement Concrete including all labour charges etc complete | 5.44 | cum | - | - |
| 1.03 | Supplying and erecting steel centering for sides and soffits including all support with all cross bracing using mild steel of size 90cm x 60cm 10 Guage stiffened with welded mild steel angle of size 25x25x3mm for boarding and providing silver oak joist 75cm x 5cm spaced at about 45cm C/c and supported by casurina,d below GL upto 3m height. including all labour charges etc complete | - | - | - | - |
| 1.04 | Below GL | 97.5 | sq.m | - | - |
| 1.05 | Above GL | 68.38 | sq.m | - | - |
| 1.06 | Cement Concrete : 1:3:6 with broken stone jusing 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete. | 14.11 | cum | - | - |
| 1.07 | Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete. | 6.05 | Mt | - | - |
| 1.08 | Towards Name Board Charges | 1 | no | - | - |
| 1.09 | Towards Photography Charges | 1 | no | - | - |
stage.html
html • 0.02 MB
finance_847454.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_847454.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .