Loading…
Loading…
Tender Value
₹4.2 L
EMD Value
₹4,159
Closing Date
29 Aug 2026, 10:00 am6d left
Sr.Executive Engineer
O/o Sr.Executive Engineer,CMD Bhabanagar
Removal of silt from Hopper No - R-2,R-3 , R-4 by removing the Silt ,debris from Silt flushing pipe of Hopper No Hopper No R-2,R-3 , R-4 till the exit as per direction of EIC complete in all respect of SVP 120MW Bhaba under CMB,Bhabanagar.
2026_HPSEB_141748_1
HPSEBL/CMD/WK-24/2026-19
Open Tender
Civil Works
Percentage
Kafnoo
Please refer Tender documents.
7 documents required · 7 mandatory
₹590
₹4,159
22 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Making choked Silt flushing pipe of Hopper No -R-2,3 & R-4 operational of SVP (120MW) by removing the Silt /debris from Silt flushing pipe of Hopper No -R-2,3 & R-4 till the exit point of the same. complete in all respect as per direction of EIC . | - | Job | 3,50,625 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
tenderdocument19.pdf
Tender Documents • 0.76 MB
BOQ_210415.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].