Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.1 LAccepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹3.9 L+₹19,700 (5.39%)Rejected-Finance | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹4.0 L+₹33,100 (9.05%)Rejected-Finance | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
₹3.7 L
EMD Value
₹4,000
Closing Date
25 Feb 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, ETC, Varanasi
Bhikaripur, DLW, Varanasi
SHIFTING, LOADING, SAFE CARRIAGE AND UNLOADING OF 132/33 KV 40 MVA ACCURATE MAKE TRANSFORMER FROM 132 KV SUBSTATION SAIDPUR TO 132 KV SUBSTATION CHOLAPUR UNDER ELECTY, TRANS. DIVISION-I, VARANASI
2021_UPTCL_549935_2
Short Term E-Tender no. 66/2020-21/ETC/VNS
Open Tender
Electrical Works
Item Rate
15 days
132 KV S/S SAIDPUR TO 132 KV S/S CHOLAPUR
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹472
SE, ETC, Varanasi
₹4,000
24 Jun 2021
19 Feb 2021
25 Feb 2021
19 Feb 2021
25 Feb 2021
20 Feb 2021
180 days
Amount
Packing of 132/33KV 40MVA Accurate make Transformer is accessories such as HV bushings , driving mechanism , marshalling box and RTCC etc. for safe transportation in wooden crates at 132KV S/S Saidpur.
Shifting of 132/33KV 40MVA Accurate make Transformer from stacking point to 20 meter distance approx. including turning of tank with all T&P and labor to complete the job satisfactorily at 132KV S/S Saidpur.
Additional shifting of 132/33KV 40MVA Accurate make Transformer up to loading point distance approx. 60Mtr @ 5 Mtr/Job at 132KV S/S Saidpur.
Loading of 132/33KV 40MVA Accurate make Transformer including all accessories on trailor the job includes the jacking of the T/F tank for placing it on the wooden sleeper under the tank and simultaneously lifting the tank by jacking and placing sleeper continuously under the tank till the wooden platform comes in alignment of trailor bed and then safe shifting the tank from wooden platform to trailor bed removal of rail etc. from under the tank, and securing the transformer completely with steel rope and turn buckle for safe transporation including all T&P and accessories.
Safe carriage of 132/33KV 40MVA Accurate make Transformer and accessories along with 20 drum T/F oil on suitable capacity trailor arranged by the contractor at his own cost from 132KV S/S Saidpur to 132KV S/S Cholapur Varanasi distance approx. 70Km. Transit insurance shall be got done by contractor as per direction of supervising engineer if required which shall be reimbursed on actual.
Unloading of 132/33KV 40MVA Accurate make Transformer at appropriate place including all accessories along with oil drums from trailor safely to avoid any damage at 132KV S/S Cholapur Varanasi.
Shifting of 132/33KV 40MVA Accurate make Transformer from unloading point to 20 meter distance approx. including turning of tank with all T&P and labour to complete the job satisfactorily at 132KV S/S Cholapur.
Additional shifting of 132/33KV 40MVA Accurate make Transformer up to Transformer plinth 10Mtr approx. distance @ 5 Mtr/Job at 132KV S/S Cholapur.
Preeti Enterprises
Ajanta Engineering works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .