Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.6 L+₹4,933.80 (1.40%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.8 L+₹31,079.07 (8.79%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.9 L+₹33,021.51 (9.34%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,760
Closing Date
4 Aug 2026, 6:00 pmClosed
XEW REW UDHAMPUR
UDHAMPUR
BOQ
2026_RDPR_315779_3
e-NIT No. 39 REW UDHAMPUR of 2026-27 Dated 13-07-2026
Open Tender
Civil Works
Percentage
30 days
XEW REW UDHAMPUR
NIT
2 documents required · 2 mandatory
₹60
XEW REW UDHAMPUR
₹7,760
8 Aug 2026
14 Jul 2026
5 Aug 2026
14 Jul 2026
4 Aug 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of sign board | 1 | No. | 2,000 | ₹2,000 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.AKOS | 56.64 | cum | 592.9 | ₹33,581.86 |
| 3 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 6.23 | cum | 479.3 | ₹2,986.04 |
| 4 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 1.7 | cum | 4,826.5 | ₹8,205.05 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 MIX . | 26.1 | cum | 5,402.9 | ₹1,41,015.69 |
| 6 | Cetring and shuttering including strutting, propping etc and removal of the formwork. foundation, footing | 98.14 | Sqm | 286.35 | ₹28,102.39 |
| 7 | Random rubble masonary without bond stone using nallah stone | 13.66 | Cum | 2,793 | ₹38,152.38 |
| 8 | Carriage of cement | 6 | MT | 1,286.81 | ₹7,720.86 |
| 9 | Carriage of Sand | 12.54 | cum | 3,694.52 | ₹46,329.28 |
| 10 | Carriage of Stone Aggregates | 25.02 | cum | 3,032.12 | ₹75,863.64 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_1026055.xls
BOQ • 0.28 MB
TENDEREXTENSION.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .