| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC | ₹5.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹5.0 L+₹3,662.67 (0.74%)Rejected-AOC | ₹5.0 L+₹3,662.67 (0.74%) | 2 | Rejected-AOC Quoted amount more than L1 |
| 3 | 3₹5.7 L+₹77,748.61 (15.7%)Rejected-AOC | ₹5.7 L+₹77,748.61 (15.7%) | 3 | Rejected-AOC Quoted amount more than L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Sr. no. 01, 02 and 03 of Eligibility criteria and Sr. no. 02 and 03 of Method of evaluation EMD not submitted. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Sr. no. 02 and 03 of Method of evaluation EMD not submitted. |
| Sl No | Description | Qty | Unit | National Furnishers and Decorators L3 | ASHU ENTERPRISES L1 | Deepak Kumar L2 |
|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 11.23 | cum | 318 ₹3,571.14 | 310 ₹3,481.3 | 180 ₹2,021.4 Lowest |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 4.68 | cum | 115 ₹538.2 | 85 ₹397.8 Lowest | 300 ₹1,404 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.55 | cum | 4,600 ₹30,130 | 4,140 ₹27,117 Lowest | 5,500 ₹36,025 |
| 1.05 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. | 388.88 | Kg | 127 ₹49,387.38 | 122 ₹47,442.99 | 100 ₹38,887.7 Lowest |
| 1.06 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used: With G.I. barbed wire. | 4,265.3 | rmt | 23 ₹98,101.9 | 18 ₹76,775.4 | 17 ₹72,510.1 Lowest |
| 1.07 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 3,649.36 | Sqm | 9 ₹32,844.24 | 4 ₹14,597.44 Lowest | 10 ₹36,493.6 |
| 1.08 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 13.04 | Sqm | 95 ₹1,238.8 | 84 ₹1,095.36 Lowest | 140 ₹1,825.6 |
| 1.09 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work (for sports court paint work) | 3,649.36 | Sqm | 98 ₹3,57,637.28 | 89 ₹3,24,793.04 | 85 ₹3,10,195.6 Lowest |
Tender Value
₹6.7 L
EMD Value
₹13,400
Closing Date
25 May 2026, 4:00 pmClosed
Faculty Incharge (Estate)
IIIT Una
Providing and fixing of barbed wire fencing in the periphery of the institute annex land in front of Gate no 1 and repainting of the various sports courts at IIIT Una
2026_IIITU_908187_1
IIITU/Annex-land/Fencing/2026
Open Tender
Civil Works
Item Rate
49 days
IIIT Una
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,400
Yes
2 Jul 2026
15 May 2026
27 May 2026
15 May 2026
25 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | cum | 1.25 | - |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 1 | cum | - | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | 53 | ₹52.95 |
| 1.05 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. | 0.8 | Kg | 10 | ₹8 |
| 1.06 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used: With G.I. barbed wire. | - | rmt | 11 | - |
| 1.07 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | - | Sqm | 10 | - |
| 1.08 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 1 | Sqm | 22 | ₹21.98 |
| 1.09 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work (for sports court paint work) | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_955178.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .