| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹10.5 Cr+₹14.6 L (1.40%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹10.6 Cr+₹20.0 L (1.92%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹10.9 Cr+₹50.9 L (4.89%)Admitted-Finance 302 SHIV SADAN OPP ANAND MILAN SOC NEAR FIVE SHOP BHATIA CHOWK ULHASNAGAR 421004 | THANE | MAHARASHTRA | 421004 | L4 | Admitted-Finance | |
| 5 | L5₹10.9 Cr+₹55.0 L (5.29%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CHOUDHARY AND BROTHERS L2 | SARAN BUILDWELL PVT. LTD. L6 | M/s Kuldeep building contractor and suppliers L3 | NAV BHARAT BUILDCON PRIVATE LIMITED L1 | M/S RAM NARAYAN CONTRACTOR L5 | Bharti Construction Company L7 | DEEPAK CONSTRUCTION COMPANY L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 16,200 | Sqm | 2.28 ₹36,891.45 | 2.5 ₹40,500 | 2.25 ₹36,450 Lowest | 2.5 ₹40,500 | 4 ₹64,800 | 2.48 ₹40,176 | 2.35 ₹38,070 |
| 2.00 | Painting standard type gauge with black, red and white un-washable paints including cost of material | 16 | R.M. | 191.29 ₹3,060.62 | 210 ₹3,360 | 189 ₹3,024 Lowest | 210 ₹3,360 | 200 ₹3,200 | 207.9 ₹3,326.4 | 197.88 ₹3,166.13 |
| 3.00 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 5,15,126.2 | Sqm | 1.32 ₹6,80,381.26 | 1.45 ₹7,46,932.99 | 1.3 ₹6,72,239.69 Lowest | 2 ₹10,30,252.4 | 2 ₹10,30,252.4 | 1.44 ₹7,41,781.73 | 1.36 ₹7,00,571.63 |
| 4.00 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.In lime mortar The rates given are for dismantling of good quality work. For dismantling poor quality or weathered ; weakened work the rates will be reduced by 30% | 929.44 | Cum | 450.35 ₹4,18,572.34 | 346.08 ₹3,21,660.6 | 260 ₹2,41,654.4 | 150 ₹1,39,416 Lowest | 450 ₹4,18,248 | 342.62 ₹3,18,444.73 | 326.11 ₹3,03,099.68 |
| 5.00 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. The rates given are for dismantling of good quality work. For dismantling poor quality or weathered ; weakened work the rates will be reduced by 30% | 10,572.1 | Sqm | 18.22 ₹1,92,602.52 | 14 ₹1,48,009.4 | 12.6 ₹1,33,208.46 Lowest | 150 ₹15,85,815 | 20 ₹2,11,442 | 13.86 ₹1,46,529.31 | 13.19 ₹1,39,446 |
| 6.00 | Removal of slit/soil/earth, sand, pebbles, Malba , debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For depth above 15 cms but upto 30cms having Unlined section | 33,704.8 | Sqm | 29.15 ₹9,82,454.47 | 32 ₹10,78,553.6 | 29.12 ₹9,81,483.78 | 50 ₹16,85,240 | 20 ₹6,74,096 Lowest | 31.68 ₹10,67,768.06 | 30.15 ₹10,16,199.72 |
| 7.00 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | 29,208.15 | Cum | 86.54 ₹25,27,541.86 | 90 ₹26,28,733.5 | 100 ₹29,20,815 | 100 ₹29,20,815 | 70 ₹20,44,570.5 Lowest | 94.05 ₹27,47,026.51 | 89.51 ₹26,14,421.51 |
| 8.00 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum | 36,206.51 | Cum | 108.4 ₹39,24,680.69 | 110 ₹39,82,716.1 | 125 ₹45,25,813.75 | 100 ₹36,20,651 | 75 ₹27,15,488.25 Lowest | 117.81 ₹42,65,488.94 | 112.13 ₹40,59,835.97 |
| 9.00 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock | 5,213.36 | Cum | 146.65 ₹7,64,564.79 | 161 ₹8,39,350.96 | 170 ₹8,86,271.2 | 125 ₹6,51,670 | 110 ₹5,73,469.6 Lowest | 159.39 ₹8,30,957.45 | 151.71 ₹7,90,918.85 |
| 10.00 | Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.at least 95% of Standard Proctor s density | 48,199.58 | Cum | 35.53 ₹17,12,294.9 | 39 ₹18,79,783.62 | 43 ₹20,72,581.94 | 35 ₹16,86,985.3 | 25 ₹12,04,989.5 Lowest | 38.61 ₹18,60,985.78 | 36.74 ₹17,70,852.57 |
Tender Value
₹11.6 Cr
EMD Value
₹23.1 L
Closing Date
3 Feb 2026, 6:00 pmClosed
CHIEF ENGINEER,WATER RESOURCES ZONE BANSWARA
CHIEF ENGINEER,WATER RESOURCES ZONE BANSWARA
Rehabilitation of Jetpura sub Irrigation Project, Tehsil- Mandalgarh District- Bhilwara
2026_WRDAS_525140_1
NIT-13/25-26/ACE/WRD-II/BHL
Open Tender
Civil Works
Item Rate
730 days
BHILWARA
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Payment accept only e-grass
₹23.1 L
Yes
CHIEF ENGINEER,WATER RESOURCES ZONE, UDAIPUR
5 Mar 2026
5 Jan 2026
4 Feb 2026
5 Jan 2026
3 Feb 2026
5 Jan 2026
16 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 16,200 | Sqm | - | - |
| 2 | Painting standard type gauge with black, red and white un-washable paints including cost of material | 16 | R.M. | - | - |
| 3 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 5,15,126.2 | Sqm | - | - |
| 4 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.In lime mortar The rates given are for dismantling of good quality work. For dismantling poor quality or weathered ; weakened work the rates will be reduced by 30% | 929.44 | Cum | - | - |
| 5 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. The rates given are for dismantling of good quality work. For dismantling poor quality or weathered ; weakened work the rates will be reduced by 30% | 10,572.1 | Sqm | - | - |
| 6 | Removal of slit/soil/earth, sand, pebbles, Malba , debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For depth above 15 cms but upto 30cms having Unlined section | 33,704.8 | Sqm | - | - |
| 7 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | 29,208.15 | Cum | - | - |
| 8 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum | 36,206.51 | Cum | - | - |
| 9 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock | 5,213.36 | Cum | - | - |
| 10 | Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.at least 95% of Standard Proctor s density | 48,199.58 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 2.04 MB
BOQ_937171.xls
BOQ • 0.35 MB
Jetpura.pdf
Tender Documents • 6.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .