| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.8 CrAccepted-AOC JANGAL SIDE TELSARA ROAD BANKI MONGRA POST KORBA DISTT KORBA C G PIN 495447 | KORBA | CHHATTISGARH | 495447 | ₹1.8 Cr Quoted ₹1.5 Cr | L-1 | Accepted-AOC The work has been awarded to the L1 Bidder |
| 2 | L-2₹1.7 Cr+₹12.6 L (8.28%)Rejected-Finance 154 I C C T P NAGAR KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | ₹1.7 Cr+₹12.6 L (8.28%) | L-2 | Rejected-Finance Due to L-2 bidder |
| 3 | L-3₹1.7 Cr+₹22.4 L (14.7%)Rejected-Finance | ₹1.7 Cr+₹22.4 L (14.7%) | L-3 | Rejected-Finance Due to L-3 bidder |
Tender Value
₹2.2 Cr
EMD Value
₹2.7 L
Closing Date
12 Apr 2023, 5:00 pmClosed
General Manager (Civil), SECL, Gevra Area
Office of the General Manager (Civil) , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Office of the General Manager (Civil) , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Office of the General Manager (Civil) , SECL, Gevra Area, P
Providing cement concrete (CC) pavement to coal transportation roads from CISF barrier no. 3 and new CISF barrier no. 7 (560 mtr.) connecting to Hardi Bazar Road including 2 nos of RCC Box culvert at Gevra Project of Gevra Area. (With 5 years comp
2023_SECL_276517_1
SECL/GA/GM(C)/ETN/22-23/169
Open Tender
Civil Works - Roads
Item Rate
180 days
SOUTH EASTERN COALFIELDS LIMITED, GEVRA AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹2.7 L
4 Jul 2023
27 Mar 2023
14 Apr 2023
27 Mar 2023
12 Apr 2023
28 Mar 2023
27 Mar 2023 - 5 Apr 2023
Amount
Item Description/Heading
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing close graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 Plant mix method (with Mechanically crushed stone only) for grading- II Material
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing close graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 Plant mix method (with Mechanically crushed stone only) for grading-III Material
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Add extra in Item No.1.05 above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. I) Mild steel
Add extra in Item No1.05 above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. ii) Tor steel
Item Description/Heading
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per relevant clauses of section 300 & 2100 in Mechanical Means Depth upto 3 m
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with . A) PCC Grade M15
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with . E) RCC Grade M25
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications and as per relevant clauses of section 1600.
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC/PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification and as per relevant clauses 305 of specifications and as per appendix 6 of IRC-78. Granular material
Total impact of GST for the purpose of CTC
M.K. Gupta and Company
ASHOK KUMAR MITTAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .