GEMC-511687790252927
Awarded to BIMAL REFRACTORIES PRIVATE LIMITED
₹4.5 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| High Alumina Roof Bricks 10-1 | BIMAL / HA70 | 6902 | 2,000 pieces | 226 | 452,000 |
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Schedule | Awardee / L1 Bidder | Status | Bids | Value |
|---|---|---|---|---|---|
| 1 | Schedule 1 | BIMAL REFRACTORIES PRIVATE LIMITED | Awarded | 1 | ₹4.5 L |
| 2 | Schedule 2 | BIMAL REFRACTORIES PRIVATE LIMITED | Awarded | 1 | ₹9.0 L |
| 3 | Schedule 3 | Not yet disclosed by govt. | Awarded | 1 | - |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
11 Oct 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HA Roof Brick
3748398
GEM/2022/B/2499226
GeM Contract
High Alumina Roof Bricks 10-1,High Alumina Roof Bricks 10-2,High Alumina Roof Bricks 10-3
GeM Contract
Kra Daadi, Arunachal Pradesh
Item wise evaluation
BOQ
Awarded to BIMAL REFRACTORIES PRIVATE LIMITED
₹4.5 L
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| High Alumina Roof Bricks 10-1 | BIMAL / HA70 | 6902 | 2,000 pieces | 226 | 452,000 |
Awarded to BIMAL REFRACTORIES PRIVATE LIMITED
₹9.0 L
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| High Alumina Roof Bricks 10-2 | BIMAL / HA70 | 6902 | 4,000 pieces | 226 | 904,000 |
Awarded to BIMAL REFRACTORIES PRIVATE LIMITED
₹4.5 L
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| High Alumina Roof Bricks 10-3 | BIMAL / HA70 | 6902 | 2,000 pieces | 226 | 452,000 |
8 documents required · 8 mandatory
2 yrs
₹80 L
₹80 L
20%
Exempted
26 Jul 2023
21 Sept 2022
11 Oct 2022
90 days from bid end date (until 9 Jan 2023)
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | High Alumina Roof Bricks 10-1 | Al2O3 - 70 percent Min.
Fe2O3 - 2.0 percent Max.
A.P.- 23 percent Max.
B.D.- 2.5 gm per cc Min.
CCS- 500 Kg per CM2
Size - plus or minus 1.5 percent or 2.0 mm whichever is greater
Drawing No. � FC 401396 | 2,000 | pieces | [email protected] | 90 |
| 2 | High Alumina Roof Bricks 10-2 | Al2O3 - 70 percent Min.
Fe2O3 - 2.0 percent Max.
A.P.- 23 percent Max.
B.D.- 2.5 gm per cc Min.
CCS- 500 Kg per CM2
Size - plus or minus 1.5 percent or 2.0 mm whichever is greater
Drawing No. � FC 401396 | 4,000 | pieces | [email protected] | 90 |
| 3 | High Alumina Roof Bricks 10-3 | Al2O3 - 70 percent Min.
Fe2O3 - 2.0 percent Max.
A.P.- 23 percent Max.
B.D.- 2.5 gm per cc Min.
CCS- 500 Kg per CM2
Size - plus or minus 1.5 percent or 2.0 mm whichever is greater
Drawing No. � FC 401396 | 2,000 | pieces | [email protected] | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3748398.pdf
GEM_BID
ha-roof-bricks-specs_2022-09-03-12-38-43_12a490d1347b05107c0aac154be064e9.pdf
BOQ
boq9_2022-09-03-12-38-43_05bef11db1f925d0d2346faa13151c85.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .