Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance 245 1A SATIN SEN SARANI KOLKATA 700054 | KOLKATA | KOLKATA | WEST BENGAL | 700054 | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹1.9 L+₹19,656 (11.8%)Accepted-Finance NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
Refer Docs
EMD Value
₹1,700
Closing Date
5 Oct 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Civil TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Repair and Maintenance works to TNEB Engineers Association Building in ICHS area at TTPS
2023_EB_371525_1
Spec.No.CE SE CIVIL TTPS 151 2023 2024
Open Tender
Civil Works - Others
Item Rate
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,700
Yes
9 Oct 2023
20 Sept 2023
6 Oct 2023
20 Sept 2023
5 Oct 2023
20 Sept 2023
Amount
Clean removal of cement plaster from walls including cost of all materials, labours, lead, lift, curing, etc. complete.
Plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete.
Dismantling the existing damaged R.C.C and disposed away from the site including cost of all labour, lead, lift, etc. complete.
Providing centering for supporting the reinforced cement concrete surfaces rate including cost of all materials, labours, lead, lift, etc. complete.
Supplying & providing RTS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc. complete.
Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Pointing with C.M 1:6, flush pointing for R.R. masonry including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing PCC 1:1.5:3 screed concrete using OP/PP cement with 6 to 10mm size machine crushed HBG metal including cost of all materials, labour, lead, lift, curing, etc. complete.
Removing the existing Cardboard False ceiling with wooden frame including cost of labour etc., complete.
Providing false ceiling with Gypsum cooling sheet of size 60 x 60cm over the aluminium section 25x25x1.6mm (T & L angle) with 50cm c/c in one direction 100cm c/c in another direction with 6mm dia M.S rod as stiffner at a distance of 1.25m c/c including cost of all materials labour lead lift scaffolding charges etc., complete.
Dismantling the damaged AC sheets & providing new Asbestos corrugated sheets, 6mm thick including cost of rafters which will be collected from scrap including cost of all materials, labours, lead, lift, safety measures, etc. complete.
Supplying laying and jointing in position of 25mm dia GI pipes ('B' Class) as instructed by the site Engineer rate including cost of all materials, labour, lead, lift etc., complete.
Supplying and fixing 110 mm dia 6Kg/cm2 pressure of PVC pipe of approved quality size of 110mm dia including cost of all specials, all other materials required, labour, lead, lift, etc., complete.
Painting two coats with ready mixed enamel paint for the old steel surface including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc. complete.
Providing two coats with snowcem of first class quality paint & approved colour including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. complete.
Providing two coats of Acrylic distemper of first class quality paint approved colour including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. complete.
TEAM ENGINEERING AND CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .